Rail Trail (Lakeville to Salisbury)
Rail-trail in Connecticut
Runs through Salisbury and Lakeville
Conditions now
Loading the weather near Lakeville…
Forecast by the National Weather Service for Lakeville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Library Street mile 1.5 directions to trailhead 1
- Parking at Library Street mile 1.5 directions to trailhead 2
- Parking at East Railroad Street mile 1.6 directions to trailhead 3
- Parking at Academy Street mile 1.6 directions to trailhead 4
- Parking at Academy Street mile 1.6 directions to trailhead 5
- Parking at Academy Street mile 1.6 directions to trailhead 6
- Parking at Academy Street mile 1.6 directions to trailhead 7
- Parking at East Railroad Street mile 1.6 directions to trailhead 8
- Parking at Academy Street mile 1.6 directions to trailhead 9
- Parking at East Railroad Street mile 1.6 directions to trailhead 10
- Parking at East Railroad Street mile 1.6 directions to trailhead 11
- Parking at Fowler Street mile 1.7 directions to trailhead 12
(opens in a new tab) About this trail
This Rail-trail is the town-owned trail on the former Central New England (CNE) railroad bed between the villages of Lakeville and Salisbury in Salisbury, Connecticut; TrailLink lists it as the Railroad Ramble. The Town of Salisbury controls about 2.25 miles of the old CNE roadbed. Built as the Connecticut Western Railroad, the line reached Lakeville from Hartford on December 21, 1871, and later became part of the Central New England Railway. Passenger service ended in December 1927, the main line from the New York state line to Lakeville was abandoned in 1938, and the line between Lakeville and Canaan was abandoned in 1965, the year the last freight ran over Salisbury's remaining rails.
The trail parallels U.S. Route 44 and measures about 1.77 miles in this record. TrailLink gives its endpoints as Farnham Road in Lakeville and Library Street in Salisbury, and the town-held corridor reaches Route 44 at its northern end. Access points include the ballfield at Route 41 and Main Street, across from the fire station, and Walton Street in Lakeville, and Salmon Kill Road and Library and Railroad streets in Salisbury. Between Walton Street and the Walton Street Extension it shares the road for a couple of blocks.
TrailLink lists asphalt, dirt and grass surfaces and numbered observation points keyed to a printed guide. A May 2025 town request for proposals described most of the trail as unimproved and often muddy and rutted, with deteriorated bridges and no formal trailheads, parking or signage. In May 2024 town officials said there was no plan to pave it as a road; a February 2024 village study had suggested porous, ADA-compliant surfacing. The 2025 request sought a design for about 1,500 feet of multimodal pathway in the Salisbury village center, between 37 Railroad Street and 20 Salmon Kill Road, with proposals due June 23, 2025.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
68% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Falls Village, 5.6 km from the trail's middle, 39 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 35 38 47 60 72 80 85 82 76 63 51 40 Low °F 14 15 23 33 44 53 58 57 49 38 29 20 Precipitation, in 3 2.5 3.4 3.4 3.9 4.8 4.8 4.4 4.7 4.7 3.5 3.8 - On the National Register
- Salisbury Center Historic District, Salisbury · historic district, listed 1997 · nomination file for Salisbury Center Historic District
- Lakeville Historic District, Salisbury · historic district, listed 1996 · nomination file for Lakeville Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1892 Cornwall sheet (1:62,500); the 1956 Sharon sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 4
Nearby trails
- Harlem Valley Rail Trail 3.8 mi away · 25.8 mi, paved · New York
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Request for Proposals: Railroad Street Multimodal Pathway Planning and Design — Town of Salisbury, Connecticut (May 2025) · government source · checked Oct 13, 2026 Supports: town-owned Rail Trail, about 2.25 miles of the old CNE railroad bed controlled by the town, unimproved muddy and rutted surface, deteriorated bridges, lack of signage, trailheads and parking, 1,500-foot pathway design between 37 Railroad Street and 20 Salmon Kill Road, June 23, 2025 deadline
- Central New England Railway (Connecticut Western Railroad) — Wikipedia · organization · checked Oct 13, 2026 Supports: Connecticut Western Railroad, later Central New England Railway, 1938 abandonment from the New York state line to Lakeville, 1965 abandonment between Lakeville and Canaan
- The history of the CNE Railroad and the Twin Lakes causeway — The Lakeville Journal (January 13, 2021) · press · checked Oct 13, 2026 Supports: first train from Hartford reached Lakeville December 21, 1871, passenger service ended December 1927, last freight over Salisbury's rails in 1965
- Behind 'Save the Rail Trail' signs — The Lakeville Journal (May 24, 2024) · press · checked Oct 13, 2026 Supports: town ownership, northern end at Route 44, February 2024 Colliers village study suggesting porous ADA-compliant surfacing, officials stating there was no plan to pave the trail
- Railroad Ramble — TrailLink · web · checked Oct 13, 2026 Supports: name Railroad Ramble, endpoints Farnham Road and Library Street, parallels US 44, access points, Walton Street road section, asphalt/dirt/grass surfaces, numbered observation points and guide
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.



