Ralph C. Wilson, Jr. Trail
Greenway in Michigan · OpenStreetMap relation
Runs through Detroit · Wayne County
Conditions now
Loading the weather near Detroit…
Forecast by the National Weather Service for Detroit · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Riverbank Road mile 0.4 directions to trailhead 1
- Parking at Riverbank Road mile 0.5 directions to trailhead 2
- Parking at Riverbank Road mile 0.7 · restrooms directions to trailhead 3
- Parking at Riverbank Road mile 0.9 directions to trailhead 4
- Parking at Riverbank Road mile 1.2 · restrooms directions to trailhead 5
- Parking at Riverbank Road mile 1.5 · restrooms directions to trailhead 6
- Parking at Riverbank Road mile 1.5 · restrooms directions to trailhead 7
- Parking at Riverbank Road mile 1.9 directions to trailhead 8
- Parking at Lakeside Drive mile 2.2 · restrooms · water directions to trailhead 9
- Parking at Oakway Trail mile 2.4 directions to trailhead 10
- Parking at Oakway Trail mile 2.5 directions to trailhead 11
- Parking at Lakeside Drive mile 2.5 directions to trailhead 12
- Parking at Lakeside Drive mile 2.8 directions to trailhead 13
- Parking at Lakeside Drive mile 2.8 directions to trailhead 14
- Parking at Lakeside Drive mile 2.9 directions to trailhead 15
- Parking at Strand Drive mile 3 directions to trailhead 16
- Parking at Strand Drive mile 3.1 directions to trailhead 17
- Parking at Strand Drive mile 3.1 directions to trailhead 18
- Parking at Strand Drive mile 3.2 directions to trailhead 19
- Parking at Strand Drive mile 3.2 directions to trailhead 20
- Parking at Strand Drive mile 3.4 directions to trailhead 21
- Parking at Strand Drive mile 3.6 directions to trailhead 22
- Parking at Strand Drive mile 3.6 · restrooms directions to trailhead 23
- Parking at Strand Drive mile 3.7 directions to trailhead 24
- Parking at Strand Drive mile 4.1 directions to trailhead 25
- Parking at Strand Drive mile 4.3 directions to trailhead 26
- Parking at Strand Drive mile 4.3 directions to trailhead 27
- Parking at Strand Drive mile 4.4 directions to trailhead 28
- Parking at Strand Drive mile 5.1 directions to trailhead 29
- Parking at Strand Drive mile 5.1 directions to trailhead 30
- Parking at Sunset Drive mile 5.7 directions to trailhead 31
- Parking at Fountain Drive mile 5.7 directions to trailhead 32
Plan your visit
- Official pageBelle Isle - Ralph C. Wilson, Jr. Trail Michigan DNR · could not be checked automatically (the site refuses scripts)
Links checked Oct 18, 2026, except those marked. Sources: Michigan DNR.
(opens in a new tab) About this trail
The Ralph C. Wilson, Jr. Trail is a 5.8-mile path that loops around Belle Isle, the 982-acre island park in the Detroit River, and is the first segment of Michigan's Iron Belle Trail at its southern terminus. Belle Isle is owned by the city of Detroit and has been managed as a state park by the Michigan Department of Natural Resources under a 30-year lease since February 10, 2014. The trail and its gateway are named for Ralph C. Wilson, Jr., a lifelong Detroit-area resident best known as the founder and 55-year owner of the Buffalo Bills. The Ralph C. Wilson, Jr. Foundation, which committed $50 million to southeast Michigan trails in 2018, helped pay for it.
The Ralph Wilson Gateway, on the eastern end of the island, is the official southern trailhead of the Iron Belle Trail, which runs more than 2,000 miles across Michigan to Ironwood in the western Upper Peninsula on separate hiking and biking routes. The gateway has a trail kiosk, a small plaza with picnic tables and a parking lot. The first phase opened on April 26, 2022, covering the half of the loop from the gateway along the beach side of the island to the MacArthur Bridge, which links Belle Isle to mainland Detroit. Work began the same day on the Eugene and Elaine C. Driker Trail, a walking route from the gateway past the Livingston Memorial Lighthouse.
The DNR announced completion of the full loop in September 2025, connecting the park to the Detroit riverfront and the city's local and regional trails. The finished trail includes a two-way cycle track. The gateway and trail together cost $10.5 million, paid from sources including the Land and Water Conservation Fund and the Michigan Natural Resources Trust Fund. Vehicles entering the park pay the state park entrance fee or carry a Recreation Passport; there is no charge to enter on foot or by bicycle.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Detroit City Airport, 7.8 km from the trail's middle, 15 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 35 45 58 70 79 84 81 74 61 48 37 Low °F 20 21 28 39 50 60 65 64 56 45 34 26 Precipitation, in 1.4 1.4 2 2.8 3.5 3.1 3.2 3.1 3.1 2.3 2.2 1.7 - On the National Register
- Belle Isle, Detroit · historic district, listed 1974 · nomination file for Belle Isle
- Old maps
USGS topographic maps of the trail's middle go back to the 1905 Grossepoint sheet (1:62,500); the 1952 Belle Isle sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesBelle Isle Park — Michigan DNR
- RedditSearch Reddit: r/Michigan
Nearby trails
- Detroit Riverwalk 0.5 mi away · 3.8 mi, paved
- Mayor Dennis W. Archer Greenway 0.7 mi away · 1.3 mi, paved
- Dequindre Cut Greenway 1.2 mi away · 2.0 mi, paved
- Conner Creek Greenway 3.3 mi away · 1.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 19440163, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Belle Isle Park — Wikipedia · organization · checked Oct 15, 2026 Supports: 982-acre island park in the Detroit River; city-owned, managed as a state park by the DNR under a 30-year lease, state park from February 10, 2014; MacArthur Bridge to mainland; entrance fee or Recreation Passport for vehicles, no charge on foot or by bicycle
- Ralph Wilson Gateway and Trail open on Belle Isle — Michigan Department of Natural Resources (bulletin, April 26, 2022) · web · checked Oct 15, 2026 Supports: gateway on the eastern end of Belle Isle is the official southern trailhead of the Iron Belle Trail; Iron Belle more than 2,000 miles to Ironwood on separate hiking and biking routes; gateway kiosk, plaza, pergola, picnic tables, parking lot and path to the sculpture; first phase ribbon-cutting April 26, 2022, from the gateway along the beach side to MacArthur Bridge; Driker Trail around part of Blue Heron Lagoon and past Livingston Memorial Lighthouse; Wilson as lifelong Detroit-area resident and founder and 55-year owner of the Buffalo Bills; foundation's 2018 $50 million trail commitment
- Belle Isle segment of Iron Belle Trail officially complete with 5.8-mile route around island — WXYZ Detroit (September 10, 2025) · web · checked Oct 15, 2026 Supports: 5.8-mile path loops the island and is the first stretch of the Iron Belle Trail; DNR statement that the completed trail connects the park to the Detroit riverfront and the city's local and regional trails; foundation partnership
- Belle Isle's new bike path completes one end 2,000-mile Iron Belle Trail — FOX 2 Detroit (September 9, 2025) · web · checked Oct 15, 2026 Supports: completion announced by the DNR in September 2025; southern terminus known as the Ralph C. Wilson, Jr. Gateway; $10.5 million combined cost with LWCF and MNRTF funding; two-way cycle track; Belle Isle Park Multimodal Mobility Study recommendations
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.