States › Michigan

Dequindre Cut Greenway

Greenway in Michigan · OpenStreetMap relation

Runs through Detroit · Wayne County

Conditions now

Loading the weather near Detroit…

Forecast by the National Weather Service for Detroit · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Dequindre Cut is a below-grade pathway, formerly a Grand Trunk Western Railroad line, located on the east side of Detroit, Michigan, just west of St. Aubin Street. Much of the Cut has been converted to a greenway; the colorful graffiti along the pathway has been left in place.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
2.0 mi 3.2 km1
Opened
20093
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Orleans Street mile 0.1 directions to trailhead 1
  2. Parking at Wilkins Street mile 0.2 directions to trailhead 2
  3. Parking at Erskine Street mile 0.2 directions to trailhead 3
  4. Parking at Orleans Street mile 0.3 directions to trailhead 4
  5. Parking at Brewster Street mile 0.3 directions to trailhead 5
  6. Parking at Wilkins Street mile 0.3 directions to trailhead 6
  7. Parking at Division Street mile 0.4 directions to trailhead 7
  8. Parking at Alfred Street mile 0.4 directions to trailhead 8
  9. Parking at Alfred Street mile 0.4 directions to trailhead 9
  10. Parking at Fisher East mile 0.5 directions to trailhead 10
  11. Parking at Orleans Street mile 0.5 directions to trailhead 11
  12. Parking at Adelaide Street mile 0.5 directions to trailhead 12
  13. Parking at Adelaide Street mile 0.5 directions to trailhead 13
  14. Parking at Jay Street mile 0.6 directions to trailhead 14
  15. Parking at Antietam Avenue mile 0.7 directions to trailhead 15
  16. Parking at Antietam Avenue mile 0.7 directions to trailhead 16
  17. Parking at Hyde Park Drive mile 0.8 directions to trailhead 17
  18. Parking at Thornhill Place mile 0.9 directions to trailhead 18
  19. Parking at Chateaufort Place mile 0.9 directions to trailhead 19
  20. Parking at Cherboneau Place mile 1 directions to trailhead 20
  21. Parking at Thornhill Place mile 1 directions to trailhead 21
  22. Parking at Saint Aubin Place mile 1 directions to trailhead 22
  23. Parking at Orleans Street mile 1.1 directions to trailhead 23
  24. Parking at East Lafayette Street mile 1.2 directions to trailhead 24
  25. Parking at Ducharme Place mile 1.3 directions to trailhead 25
  26. Parking at East Larned Street mile 1.3 directions to trailhead 26
  27. Parking at Saint Aubin Street mile 1.4 directions to trailhead 27
  28. Parking at Woodbridge Street mile 1.4 directions to trailhead 28
  29. Parking at East Jefferson Avenue mile 1.5 directions to trailhead 29
  30. Parking at Orleans Street mile 1.5 directions to trailhead 30
  31. Parking at Woodbridge Street mile 1.5 directions to trailhead 31
  32. Parking at Franklin Street mile 1.5 directions to trailhead 32
  33. Parking at Woodbridge Street mile 1.5 directions to trailhead 33
  34. Parking at Orleans Street mile 1.6 directions to trailhead 34
Dequindre Cut Detroit a.JPG (opens in a new tab)
Dequindre Cut Detroit a.JPG · Photo: Andrew Jameson · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Dequindre Cut is a nearly two-mile, below-grade greenway on Detroit's east side that connects Eastern Market, the Detroit Riverfront and the neighborhoods between them. It follows a former Grand Trunk Railroad line just west of St. Aubin Street and is managed by the Detroit Riverfront Conservancy, which led its creation and counts it as part of the 27.5-mile Joe Louis Greenway. The line was built in the 1830s by the Detroit and Pontiac Railroad, a predecessor of the Grand Trunk Western. In 1923 the city and the railroad began a program of 22 grade separations, sixteen of them finished by March 1930. Passenger service ended in 1982, and between 1998 and 2000 Canadian National sold the 3.5-mile section south of its main line that includes the Cut.

A partnership of the federal government, the City of Detroit, the Community Foundation for Southeast Michigan and the Detroit Economic Growth Corporation built the greenway. The first section, about 1.2 miles, opened in May 2009; the half-mile extension north from Gratiot Avenue to Mack Avenue, begun in 2013, opened in April 2016 as part of the Link Detroit project, which included a $10 million federal TIGER grant. From south of Mack Avenue along the east edge of Eastern Market the path descends to about 25 feet below grade and reaches the riverfront south of Jefferson Avenue. Entrance ramps are at Atwater, Franklin, Woodbridge, Lafayette, Gratiot, Wilkins and Mack.

The path is 20 feet wide and paved, with separate lanes for pedestrians and bicycles, and is open 6 a.m. to 10 p.m. daily. There are no designated parking lots; street parking is available near each entrance, and portable toilets stand near the Campbell Terrace stage from April through October. In July 2024 WDET reported a $20 million federal RAISE grant, about half of it to extend the Cut north to Warren Avenue, with construction expected to begin in late 2025.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Detroit City Airport, 7.5 km from the trail's middle, 10 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323545587079848174614837
Low °F202128395060656456453426
Precipitation, in1.41.422.83.53.13.23.13.12.32.21.7
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Detroit sheet (1:62,500); the 1954 Detroit sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12399543, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Dequindre Cut”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q5261120, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Dequindre Cut - Parks & Greenways | Detroit Riverfront Conservancy · organization · checked Oct 15, 2026
    Supports: nearly two miles, below grade, connects Eastern Market and riverfront, managed by the Conservancy, part of the 27.5-mile Joe Louis Greenway, former Grand Trunk line, May 2009 opening and 2016 extension, partnership, 20-foot path with separate lanes, entrance ramps, hours, no parking lots, portable toilets near Campbell Terrace
  5. Dequindre Cut - Wikipedia · organization · checked Oct 15, 2026
    Supports: west of St. Aubin Street, Detroit and Pontiac Railroad in the 1830s, 1923 grade-separation program and 1930 progress, passenger service end 1982, 1998-2000 sale by Canadian National, 1.2-mile first section, 2013 start of Gratiot-Mack extension, Link Detroit and TIGER grant, 25 feet below grade
  6. Detroit Evening Report: City receives $20M grant to connect Joe Louis Greenway with Iron Belle Trail - WDET · organization · checked Oct 15, 2026
    Supports: 2024 RAISE grant, half to extend the Dequindre Cut north to Warren Avenue, construction expected late 2025

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.