Rouge River Gateway Trail
Greenway in Michigan · OpenStreetMap relation
Runs through Dearborn · Wayne County
Conditions now
Loading the weather near Dearborn…
Forecast by the National Weather Service for Dearborn · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 0.5 directions to trailhead 1
- Parking mile 0.7 directions to trailhead 2
- Parking mile 0.7 directions to trailhead 3
- Parking at John Montieth Boulevard mile 0.9 directions to trailhead 4
- Parking at Fair Lane Drive mile 0.9 directions to trailhead 5
- Parking at Fair Lane Drive mile 1 directions to trailhead 6
- Parking at Fair Lane Drive mile 1.2 directions to trailhead 7
- Parking at Fair Lane Drive mile 1.3 directions to trailhead 8
- Parking at Richard Drive mile 1.5 directions to trailhead 9
- Parking at Fair Lane Drive mile 1.5 directions to trailhead 10
- Parking at Michigan Avenue mile 2 directions to trailhead 11
- Parking at Michigan Avenue mile 2.2 directions to trailhead 12
- Parking at Newman Street mile 2.2 directions to trailhead 13
- Parking at Michigan Avenue mile 2.2 directions to trailhead 14
- Parking at Michigan Avenue mile 2.3 directions to trailhead 15
- Parking at South Brady Street mile 2.4 directions to trailhead 16
Plan your visit
- By trainAmtrak: Dearborn, MI (DER) under 0.1 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Rouge River Gateway Trail is a paved greenway of about two miles along the Rouge River in Dearborn, Michigan, between Hines Park and the west downtown area of the city; it is sometimes called the Dearborn Gateway Trail locally. It is the first phase of the Rouge Gateway Greenway, a corridor planned in a master plan completed in February 2001 by the Rouge Gateway Partnership of Wayne County and thirteen communities, organizations and companies. Friends of the Rouge leads the effort. It is not a rail-trail.
Phase 1, completed in 2005, runs from Hines Drive north of Ford Road to Dearborn's west retail area on Michigan Avenue. Coming south from Hines Park, the trail passes through woods and over bridges onto the Henry Ford College campus, then past Fair Lane, Henry Ford's estate and now a museum, and ends near the Dearborn Historical Museum, with a trailhead at Ford Field. The mapped route includes river bridges and a boardwalk section. In June 2022 construction began on Wayne County's Hines Park-Parkland Park Connector, a two-mile greenway linking the Gateway Trail to Parkland Park in Dearborn Heights.
Phase 2 adds 1.9 miles of asphalt trail from just west of Evergreen Road and north of Michigan Avenue, at the confluence of the Lower and Main branches of the Rouge, downstream to Village Road near the Henry Ford Museum, west of the Southfield Freeway. Friends of the Rouge secured $6.9 million for construction from Wayne County Economic Development and the Ralph C. Wilson Jr. Foundation, and held a bridge-setting ceremony marking construction on August 20, 2026. A Phase 3 design would extend the trail from Village Road to Rotunda Drive in Allen Park.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
39% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Dearborn, 0.3 km from the trail's middle, 2 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 35 45 58 70 79 84 82 75 62 48 37 Low °F 18 19 26 37 48 58 62 61 53 42 32 24 Precipitation, in 2.5 2.3 2.3 3.3 3.6 3.3 3.5 3.2 3 2.9 2.7 2.5 Snow, in 11.7 7.3 5.7 0.6 0 0 0 0 0 0 0.9 4.6 - On the National Register
- Greenfield Village and Henry Ford Museum, Dearborn · historic district, listed 1969 · nomination file for Greenfield Village and Henry Ford Museum
- Fair Lane, Dearborn · historic district, listed 1966
- Old maps
USGS topographic maps of the trail's middle go back to the 1905 Detroit sheet (1:62,500); the 1952 Dearborn sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of the Rouge — Rouge Gateway Greenway
Nearby trails
- Hines Park Trail within 0.2 mi · 17.8 mi, paved
- Inkster Park Greenway 3.1 mi away · 1.3 mi, surface unknown
- Joe Louis Greenway 4.7 mi away · 6.6 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 6176457, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Building the Rouge Gateway Greenway — Friends of the Rouge · organization · checked Oct 15, 2026 Supports: February 2001 master plan with the Rouge Gateway Partnership (Wayne County and thirteen communities, organizations and companies); Phase 1 from Hines Drive north of Ford Road to Michigan Avenue completed 2005; Phase 2 route, 1.9 miles, $6.9 million from Wayne County Economic Development and the Ralph C. Wilson Jr. Foundation; Phase 3 design to Rotunda Drive in Allen Park
- Rouge Rundown - August 27, 2026 — Friends of the Rouge · organization · checked Oct 15, 2026 Supports: August 20 bridge-setting ceremony marking construction of Phase 2; 1.9 miles of asphalt from west of Evergreen Road to Village Road near the Henry Ford Museum
- Dearborn's Gateway Trail is just that: A gateway to the city's history, culture, businesses and more — Metromode (June 16, 2022) · web · checked Oct 15, 2026 Supports: also called the Dearborn Gateway Trail; two miles from Hines Park to Ford Field trailhead; woods, bridges, Henry Ford College, Fair Lane museum, Dearborn Historical Museum; June 2022 groundbreaking of the two-mile Hines Park-Parkland Park Connector
- Rouge River Gateway Trail — OpenStreetMap relation 6176457 · web · checked Oct 15, 2026 Supports: paved route with bridges and a boardwalk section
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.