States › Michigan

Joe Louis Greenway

Greenway in Michigan

Runs through Highland Park, Detroit and Dearborn · Wayne County

Conditions now

Loading the weather near Detroit…

Forecast by the National Weather Service for Detroit · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Joe Louis Greenway is a 27.5-mile (44 km) urban greenway in Detroit, Michigan, designed to connect neighborhoods, parks, commercial corridors, and public spaces. Named after heavyweight boxing champion Joe Louis, a Detroit native, the Greenway is intended to support walking, biking, transit use, and other non-motorized forms of transportation while promoting equity, economic development, and environmental sustainability.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
6.6 mi 10.6 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at McDonald Street mile 0.1 directions to trailhead 1
  2. Parking at McDonald Street mile 0.2 directions to trailhead 2
  3. Parking at McDonald Street mile 0.2 directions to trailhead 3
  4. Parking at Alpine Street mile 1.1 directions to trailhead 4
  5. Parking at West Davison Avenue mile 3.2 directions to trailhead 5
  6. Parking at Lawton Street mile 4.7 directions to trailhead 6
  7. Parking at Linwood Avenue mile 4.8 directions to trailhead 7
  8. Parking at Oakman Boulevard mile 4.9 directions to trailhead 8
  9. Parking at Oakman Boulevard mile 5.1 directions to trailhead 9

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Joe Louis Greenway (opens in a new tab)
Photo: codgis · CC BY-SA 4.0 · Mapillary

About this trail

The Joe Louis Greenway is a walking and biking path being built by the City of Detroit, Michigan, and named for heavyweight boxing champion Joe Louis, a Detroit native. When finished it is planned as a loop through Detroit, Hamtramck, Highland Park and Dearborn, linking more than 23 neighborhoods and connecting with the Dequindre Cut and the Detroit Riverwalk. Planned length figures differ: 27 miles in a 2025 WXYZ report, 27.5 miles in WDET's 2022 report and Wikipedia, and 29 miles in a 2025 WDET interview. A key piece is a 7.5-mile abandoned Conrail railroad corridor that the city acquired in 2019.

The first section on the old rail line opened in November 2022 on the city's west side, running from Warren Avenue near McDonald Street, where Detroit meets Dearborn, north to Joy Road. It follows the former Conrail line through an industrial area and behind the backyards of the Barton McFarland neighborhood, with two concrete pathways, lighting, trash cans and red emergency posts; gravel paths for runners were planned. In October 2025 the city opened a further two-mile stretch with a trailhead park near Grand River and Oakman and a statue of Joe Louis as a golfer, bringing the completed greenway to six miles, with six more miles set to open in 2026.

This record maps about 6.6 miles of built path, from McDonald Street near the Dearborn line north past Alpine Street and West Davison Avenue, with a further piece in the North Campau area. Mileage counts of the open greenway also vary between sources, and the city's own project pages could not be reached.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Detroit City Airport, 10.8 km from the trail's middle, 6 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323545587079848174614837
Low °F202128395060656456453426
Precipitation, in1.41.422.83.53.13.23.13.12.32.21.7
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Detroit sheet (1:62,500); the 1952 Royal Oak sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • One rider in 2024 parked at Warren, rode about a mile north to Joy Road, and counted three dedicated parking lots along the path; the paved path beyond Joy was still closed for construction. r/Detroit, May 2024
  • Riders in November 2026 said the barricades were gone but some stretches were still dirt; one found gravel and trenches at the Livernois crossing that required walking. r/Detroit, Nov 2026
  • Riders in November 2026 called the road crossings more annoying than the gentle curves, and some worried about fast traffic at the Mack and Oakman crossings. r/Detroit, Nov 2026
  • Riders in October 2025 said the Highland Park end near Woodward was not open and muddy under construction; in May 2026 one said it was not rideable, while another said it was. r/Detroit, Oct 2025 · r/Detroit, May 2026
15 Reddit threads about this trail, Apr 2024 to Nov 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Joe Louis Greenway”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q123459859, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. A stretch of the Joe Louis Greenway opens along former railway on Detroit's west side — WDET 101.9 FM · organization · checked Oct 15, 2026
    Supports: November 2022 opening; Warren Avenue near McDonald Street to Joy Road; former Conrail line; Barton McFarland neighborhood; concrete pathways, lighting, emergency posts, planned gravel paths; 27.5 miles through four cities; connection with Dequindre Cut and Riverwalk
  5. The Metro: Detroit's greenway continues its expansion around the city — WDET 101.9 FM · organization · checked Oct 15, 2026
    Supports: 29-mile planned length; 23 neighborhoods
  6. Joe Louis Greenway — Wikipedia · organization · checked Oct 15, 2026
    Supports: named for Joe Louis, a Detroit native; cities on the route; 23 neighborhoods; connections to Dequindre Cut and Riverwalk; 7.5-mile Conrail corridor acquired 2019
  7. City of Detroit unveils new stretch of Joe Louis Greenway and statue honoring boxing legend — WXYZ Detroit (Oct. 7, 2025) · web · checked Oct 15, 2026
    Supports: two-mile stretch opened October 2025; trailhead park near Grand River and Oakman; golfer statue; six miles complete, six more in 2026; 27-mile loop through Highland Park, Dearborn and Hamtramck
  8. OpenStreetMap — OpenStreetMap contributors · web · checked Oct 15, 2026
    Supports: mapped extent: McDonald Street, Alpine Street, West Davison Avenue trailheads; North Campau area

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.