S. Hampton Roads Trail
Rail-trail in Virginia
Runs through Chesapeake and Portsmouth
Conditions now
Loading the weather near Portsmouth…
Forecast by the National Weather Service for Portsmouth · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Tyre Neck Road mile 1.5 directions to trailhead 1
- Parking at Tyre Neck Road mile 1.6 directions to trailhead 2
- Parking at Tyre Neck Road mile 1.7 directions to trailhead 3
- Parking at High Street West mile 1.7 directions to trailhead 4
- Parking at High Street West mile 1.8 directions to trailhead 5
- Parking at High Street West mile 1.8 directions to trailhead 6
- Parking at Taylor Road mile 2.6 directions to trailhead 7
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
This record is a section of the South Hampton Roads Trail, a planned trail of about 41 miles that is to run from downtown Suffolk, Virginia, through Chesapeake and Portsmouth to Norfolk, using the Elizabeth River Ferry, and on to the Virginia Beach Oceanfront. The record maps about 2.6 miles of paved trail, nearly all in the Churchland area of Portsmouth, from Dorden Street just inside Chesapeake east across High Street West. In late 2023 construction had recently begun on the Portsmouth section, planned at just under two miles. In January 2026 Chesapeake expected to start building its second phase, from Dorden Street to Taylor Road, that spring.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
36% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to June and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Norfolk Nas, 13.5 km from the trail's middle, 0 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 50 53 59 70 77 84 89 86 81 72 61 54 Low °F 34 35 41 50 60 68 73 72 67 56 45 38 Precipitation, in 2.9 2.5 3.5 3.3 3.5 4.6 5.2 5.3 5.1 3.6 3.1 2.9 Snow, in 2.3 0.7 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1907 Norfolk sheet (1:125,000); the 1955 Bowers Hill sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Western Branch Trail 0.6 mi away · 3.0 mi, paved
- Suffolk Seaboard Coastline Trail 1.9 mi away · 3.4 mi, paved
- Elizabeth River Trail 3.2 mi away · 4.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- 41-mile bike trail connecting 5 Hampton Roads cities still a work in progress — WTKR (undated, about late 2023) · web · checked Oct 14, 2026 Supports: South Hampton Roads Trail; 41 miles; downtown Suffolk through Chesapeake and Portsmouth to Norfolk via the Elizabeth River Ferry and on to the Virginia Beach Oceanfront; construction recently begun on the Portsmouth section, just under two miles long
- 300 miles of trails: Chesapeake recognized for expanding connectivity plan — The Virginian-Pilot via Yahoo News (January 10, 2026) · web · checked Oct 14, 2026 Supports: trail will connect Suffolk to Virginia Beach's Oceanfront; second phase from Dorden Street to Taylor Road, construction slated for spring
- OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 14, 2026 Supports: mapped route through Churchland, Portsmouth, from Dorden (OSM: Dordon) Street in Chesapeake across High Street West; paved
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.