Western Branch Trail
Rail-trail in Virginia
Runs through Chesapeake
Conditions now
Loading the weather near Chesapeake…
Forecast by the National Weather Service for Chesapeake · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Bruce Road mile 1 directions to trailhead 1
- Parking at Bruce Road mile 1 directions to trailhead 2
- Parking at Bruce Road mile 1.1 directions to trailhead 3
- Parking at Deborah Court mile 1.1 directions to trailhead 4
- Parking at North Radcliffe Lane mile 1.2 directions to trailhead 5
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Western Branch Trail is a paved multi-use trail in the Western Branch area of Chesapeake, Virginia, being built by the City of Chesapeake in phases. It is part of the South Hampton Roads Trail, a route of about 41 miles planned to run from downtown Suffolk through Chesapeake and Portsmouth and, by way of the Elizabeth River Ferry, through Norfolk to the Virginia Beach Oceanfront, linking five of the seven Hampton Roads cities.
The first phase ends at Dorden Street. A second phase is to carry the trail from Dorden Street to Taylor Road; a May 2025 Elizabeth River Trail post, citing the Virginian-Pilot, said that phase faced substantial hurdles, and in January 2026 the city said construction was scheduled to begin that spring.
Chesapeake has reported delays in coordinating with federal agencies on the South Hampton Roads Trail, whose design and construction were under way in early 2026, and a WTKR report described the Portsmouth section of the route, just under 2 miles, as recently under construction.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
38% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to June and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Norfolk Nas, 16.3 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 50 53 59 70 77 84 89 86 81 72 61 54 Low °F 34 35 41 50 60 68 73 72 67 56 45 38 Precipitation, in 2.9 2.5 3.5 3.3 3.5 4.6 5.2 5.3 5.1 3.6 3.1 2.9 Snow, in 2.3 0.7 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1907 Norfolk sheet (1:125,000); the 1955 Bowers Hill sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- S. Hampton Roads Trail 0.6 mi away · 2.6 mi, paved
- Suffolk Seaboard Coastline Trail 0.6 mi away · 3.4 mi, paved
- Elizabeth River Trail 4.9 mi away · 4.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Trailside With Ty: Community Connection and Service — Elizabeth River Trail (May 30, 2025) · organization · checked Oct 14, 2026 Supports: name Western Branch Trail, Phase 2 from the current terminus at Dorden Street to Taylor Road, hurdles reported by the Virginian-Pilot
- 300 miles of trails: Chesapeake recognized for expanding connectivity plan — The Virginian-Pilot via Yahoo News (January 10, 2026) · web · checked Oct 14, 2026 Supports: Phase 2 from Dorden Street to Taylor Road with construction scheduled to begin in spring 2026, South Hampton Roads Trail design and construction under way, earlier delays coordinating with federal agencies, Suffolk to the Virginia Beach Oceanfront
- 41-mile bike trail connecting 5 Hampton Roads cities still a work in progress — WTKR · web · checked Oct 14, 2026 Supports: South Hampton Roads Trail of about 41 miles from downtown Suffolk through Chesapeake, Portsmouth and Norfolk (via the Elizabeth River Ferry) to the Virginia Beach Oceanfront, five of seven Hampton Roads cities, Portsmouth section just under two miles under construction, Chesapeake portion paved
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.