San Fernando Bike Path 3
Greenway in California
Runs through Los Angeles · Los Angeles County
Conditions now
Loading the weather near Los Angeles…
Forecast by the National Weather Service for Los Angeles · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Penrose Street mile 2.2 directions to trailhead 1
- Parking at San Fernando Road mile 2.3 directions to trailhead 2
- Parking at Olinda Street mile 2.5 directions to trailhead 3
- Parking at Vineland Avenue mile 2.6 directions to trailhead 4
Plan your visit
- By trainAmtrak: Burbank, CA (BUR) 1.0 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
San Fernando Bike Path 3, as OpenStreetMap names it, is the third and final phase of the San Fernando Bike Path in Los Angeles, a paved path of about 9.8 miles that the Los Angeles Department of Transportation built beside Metrolink's Antelope Valley Line along San Fernando Road from Sylmar to the Burbank border. The earlier phases, 5.9 miles from Roxford Street to Branford Street, have their own page as the San Fernando Road Bike Path. This phase, opened in September 2024, adds more than 4 miles on the east side of San Fernando Road from Branford Street through Sun Valley to the Burbank line, with a bridge over Tujunga Wash, lighting, fencing along the railroad and bicycle-activated signals.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to June. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Burbank Glendale Pasadena Airport, 3.5 km from the trail's middle, 34 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 67 67 70 73 76 80 87 89 87 79 72 66 Low °F 45 46 49 52 57 60 64 65 63 58 49 44 Precipitation, in 3 4 2.4 0.7 0.3 0.1 0 0 0.1 0.6 0.7 2 - Old maps
USGS topographic maps of the trail's middle go back to the 1894 Los Angeles sheet (1:62,500); the 1953 Van Nuys sheet (1:24,000) shows the area at mid-century. Browse all 22 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- San Fernando Road Bike Path within 0.2 mi · 4.7 mi, paved
- Hansen Dam Bike Path 1.2 mi away · 2.5 mi, paved
- Burbank Chandler Bikeway 2.3 mi away · 3.0 mi, paved
- Tujunga Wash Greenway 3.1 mi away · 3.2 mi, paved
- Metro G Line Bikeway 4.3 mi away · 15.2 mi, paved
- Los Angeles River Greenway 4.8 mi away · 35.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Eyes on the Street: San Fernando Road Bike Path Nearly Complete — Streetsblog California (March 2, 2022) · press · checked Oct 16, 2026 Supports: rail-with-trail beside Metrolink's Antelope Valley Line, existing 5.9 miles from Roxford Street to Branford Street, Phase III 4.2 miles from Branford Street to the Los Angeles-Burbank border at the Burbank Airport North Metrolink station, Sun Valley, about 10 miles in all
- LADOT completes final phase of San Fernando Bike Path construction — Mass Transit (LADOT press release, September 17, 2024) · web · checked Oct 16, 2026 Supports: final phase (Phase III) completed September 2024, more than four miles of separated path on the east side of San Fernando Road between Branford and Cohasset streets, 9.8-mile facility extending north to Sylmar, Metrolink Antelope Valley Line, Tujunga Wash bikeway bridge, solar-powered lighting, safety fencing along the rail line, bicycle-activated signals
- San Fernando Bike Path 3 (way 730897842 and sibling ways) — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: record's name, mapped extent from Branford Street to North San Fernando Boulevard at the Burbank line
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.