States › Iowa

Shaulis Road Trail

Greenway in Iowa

Runs through Waterloo · Black Hawk County

Conditions now

Loading the weather near Waterloo…

Forecast by the National Weather Service for Waterloo · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
6.2 mi 10.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East Shaulis Road mile 1.1 directions to trailhead 1
  2. Parking at Dubois Drive mile 5.7 directions to trailhead 2
  3. Parking at West Shaulis Road mile 5.8 directions to trailhead 3
  4. Parking at West Shaulis Road mile 5.8 directions to trailhead 4
  5. Parking at West Shaulis Road mile 5.9 directions to trailhead 5
  6. Parking at West Shaulis Road mile 6 directions to trailhead 6

Plan your visit

    More stops from state data

    Links checked Oct 18, 2026. Sources: Iowa DOT Trail Amenities (CC BY 4.0).

    Shaulis Road Trail (opens in a new tab)
    Photo: FeetAndInches · CC BY-SA 4.0 · Mapillary

    About this trail

    The Shaulis Road Trail is a paved roadside trail of about 6 miles on the south side of Waterloo in Black Hawk County, Iowa, and one of the trails promoted by the Cedar Valley Trails Partnership. It parallels Shaulis Road from U.S. Highway 63, where it meets the Sergeant Road Trail running north-south between Waterloo and Hudson, east to the southeast side of Waterloo, ending just east of Hess Road.

    In April 2014 the Waterloo City Council approved an agreement with the Iowa Department of Transportation to extend the trail nearly two miles, from Hawkeye Road (Iowa Highway 21) to Isle of Capri Boulevard, the entrance road to the Isle Casino Hotel Waterloo. Federal funds were to cover up to 80 percent of the cost, up to $412,000, and state recreational trail funds 20 percent, or $103,000. At the time the trail ran from U.S. 63 to Highway 21 on the north side of Shaulis Road, and city staff said later phases would continue east to connect with the Cedar Valley Nature Trail; construction was expected the following year.

    The partnership lists the surface as asphalt and the trail as open to biking, running, walking and roller skating, with parking available. It describes a final section, still to be built, that will link the trail to the Cedar Valley Nature Trail, the 67-mile rail-trail through eastern Iowa; until then county roads connect the two.

    Sources checked Oct 15, 2026 · CC BY 4.0

    History and riding conditions

    From federal and state maps, matched to the trail's mapped line.

    Shade

    5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

    When to ride

    Best months: May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

    Monthly normals, 1991–2020
    Waterloo Municipal Airport, 12.8 km from the trail's middle, 23 m lower
    NormalJanFebMarAprMayJunJulAugSepOctNovDec
    High °F283346617382858377634734
    Low °F111527385061646152402817
    Precipitation, in1.11.1244.65.74.34.23.12.81.91.4
    Snow, in10.19.34.61.70.100000.33.19.9
    Old maps

    USGS topographic maps of the trail's middle go back to the 1954 Waterloo sheet (1:250,000); the 1963 Waterloo South sheet (1:24,000) shows the area at mid-century. Browse all 4 maps in topoView.

    Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

    Community

    Where people who ride and look after this trail post: notices, conditions, work days.

    Nearby trails

    Take it with you

    Download GPX GeoJSON

    Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

    Something wrong?

    Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

    Sources

    1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
    2. Shaulis Road Trail — Cedar Valley Trails Partnership · organization · checked Oct 15, 2026
      Supports: 6 mi; asphalt; roadside; Black Hawk County, Iowa; parallels Shaulis Road from Highway 63 near Hudson to just east of Hess Road in southeast Waterloo; final section to connect to the Cedar Valley Nature Trail, county roads connect meanwhile; activities biking, running, walking, roller skating; parking; connecting Sergeant Road Trail (parallels US 63 from Waterloo to Hudson) and Cedar Valley Nature Trail (67-mile rail trail)
    3. Waterloo gives green light to Shaulis trail extension — BikeIowa (April 23, 2014) · web · checked Oct 15, 2026
      Supports: council approval of Iowa DOT agreement; extension of nearly two miles from Hawkeye Road (Iowa 21) to Isle of Capri Boulevard; federal 80% up to $412,000, state 20% or $103,000; existing trail from US 63 to Highway 21 on the north side of Shaulis Road; future phases to the Cedar Valley Nature Trail; construction anticipated the next year

    Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.