States › Alaska

Ship Creek Trail

Greenway in Alaska · OpenStreetMap relation

Runs through Anchorage · Anchorage Municipality

Conditions now

Loading the weather near Anchorage…

Forecast by the National Weather Service for Anchorage · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Greenway trail entirely separated from non-motorized network

Length
2.6 mi 4.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Ship Creek Trailhead mile 0 directions to Ship Creek Trailhead
  2. Parking at Richmond Avenue mile 0.1 directions to trailhead 2
  3. Parking mile 0.1 directions to trailhead 3
  4. Parking at North Post Road mile 1.4 directions to trailhead 4
  5. Parking at East Ship Creek Avenue mile 2.1 directions to trailhead 5
  6. Parking at East Ship Creek Avenue mile 2.1 directions to trailhead 6
  7. Parking at East Whitney Road mile 2.3 directions to trailhead 7
  8. Parking at East Ship Creek Avenue mile 2.4 directions to trailhead 8
  9. Parking at East Ship Creek Ave mile 2.5 · restrooms · water directions to trailhead 9
  10. Parking at East Ship Creek Ave mile 2.5 · restrooms · water directions to trailhead 10
  11. Parking at North C Street mile 2.6 · restrooms · water directions to trailhead 11
Anchorage Depot, beside the trail (opens in a new tab)
Anchorage Depot, beside the trail · Photo: Len Turner from Lufkin, TX, USA · CC BY 2.0 · Wikimedia Commons

About this trail

The Ship Creek Trail is a paved path of about 2.5 miles in Anchorage, Alaska, that follows Ship Creek east from downtown. Its western trailhead is near the Alaska Railroad depot and the Ship Creek fish ladder, and it ends in the parking lot of William Tyson Elementary School in Mountain View, where it meets the Peterkin Avenue bike boulevard. The Anchorage tourism site lists the length as 2.5 miles and another page from the same site as 5.8 miles; the shorter figure matches the route described.

The corridor is lined with railroad tracks and industrial yards. Fishing for king and silver salmon is limited to the far western end, though the creek can be watched along the whole path. The trail is part of the Moose Loop, which links the Campbell Creek, Lanie Fleischer Chester Creek and Tony Knowles Coastal Trails.

A gap remains between the Ship Creek Trail and the Tony Knowles Coastal Trail. Anchorage Daily News reported in 2023 that a link of roughly a mile past the Small Boat Launch would be built with $7.7 million in federal funds through AMATS, with construction expected from 2025 to 2026, and that the Alaska Railroad was replacing a bridge over Ship Creek so the path could pass beneath it.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Anchorage Merrill Field, 0.8 km from the trail's middle, 25 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F232834475866686657422925
Low °F81217304150545143301611
Precipitation, in0.50.70.50.30.611.72.531.60.90.9
Old maps

USGS topographic maps of the trail's middle go back to the 1951 Anchorage sheet (1:250,000); the 1953 Anchorage A-8 sheet (1:63,360) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 15661243, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Ship Creek Trail - Visit Anchorage · web · checked Oct 17, 2026
    Supports: length of 2.5 miles, endpoints, fishing, bike boulevard connection, corridor setting
  3. Ship Creek Trail - Visit Anchorage · web · checked Oct 17, 2026
    Supports: paved surface, Moose Loop connections, 5.8-mile listing
  4. Missing link unlocked: funding paves way for connecting Anchorage's Coastal and Ship Creek trails - Anchorage Daily News · web · checked Oct 17, 2026
    Supports: planned link of about one mile, $7.7 million federal funds, 2025-2026 construction timeline, railroad bridge replacement

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.