States › Alaska

Tony Knowles Coastal Trail

Greenway in Alaska · OpenStreetMap relation

Runs through Anchorage · Anchorage Municipality

Conditions now

Loading the weather near Anchorage…

Forecast by the National Weather Service for Anchorage · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Tony Knowles Coastal Trail is an 11-mile-long (18 km) trail along the coast of Anchorage, Alaska designated for non-motorized use. The trail runs from Second Avenue in downtown Anchorage and finishes in Kincaid Park. The trail is entirely paved, supports two-way traffic, and connects with the Chester Creek Trail. Point Woronzof Park borders the coastal trail to the east for about a mile, starting at about mile 5.0. In the summer, the trail is used extensively by walkers, runners, rollerbladers, and cyclists. In the winter, the trail is used primarily for cross country skiing and also skijoring. The trail is a portion of the annual Tour of Anchorage cross country ski marathon. The trail's namesake is the former Anchorage mayor and Alaska governor.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
10.4 mi 16.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Kincaid Park Trailhead mile 0 · restrooms · water directions to Kincaid Park Trailhead
  2. Parking at Raspberry Road mile 0 · restrooms · water directions to trailhead 2
  3. Parking at Raspberry Road mile 0 · restrooms · water directions to trailhead 3
  4. Parking at Hutson Drive mile 5 directions to trailhead 4
  5. Parking at Point Woronzof Overlook mile 5.2 · restrooms directions to trailhead 5
  6. Parking at Point Woronzof Drive mile 6.2 directions to trailhead 6
  7. Parking at Stolt Lane mile 9.4 directions to trailhead 7
  8. Parking at Stolt Lane mile 9.5 directions to trailhead 8
  9. Parking at West 8th Avenue mile 9.6 directions to trailhead 9
  10. Parking at M Street mile 9.9 directions to trailhead 10
  11. Parking at West 5th Avenue mile 9.9 directions to trailhead 11
  12. Parking at M Street mile 9.9 directions to trailhead 12
  13. Parking at M Street mile 10 directions to trailhead 13
  14. Parking at West 3rd Avenue mile 10 directions to trailhead 14
  15. Parking at West 2nd Avenue mile 10.1 directions to trailhead 15
  16. Parking at West 2nd Avenue mile 10.1 directions to trailhead 16
  17. Parking at West 3rd Avenue mile 10.2 directions to trailhead 17
  18. Parking at West 2nd Avenue mile 10.2 directions to trailhead 18
  19. Coastal Trail mile 10.3 directions to Coastal Trail
  20. Diamond Parking mile 10.3 directions to Diamond Parking

Plan your visit

Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).

Earthquake Park Trail, Anchorage, Alaska, Summer 01.jpg (opens in a new tab)
Earthquake Park Trail, Anchorage, Alaska, Summer 01.jpg · Photo: Laura Alier · CC BY 4.0 · Wikimedia Commons

About this trail

The Tony Knowles Coastal Trail is an 11-mile paved trail in Anchorage, Alaska, that runs from the Alaska Railroad station area at 2nd Avenue downtown to Kincaid Park. Rails to Trails Conservancy gives the endpoints as W. 2nd Avenue and H Street and Kincaid Park, and lists the surface as asphalt with soft shoulders for runners. The American Planning Association describes it as two lanes wide and open to non-motorized users. It is named for Tony Knowles, a former Anchorage mayor and Alaska governor.

According to the American Planning Association, the trail was built in four phases between 1986 and 1988 at a cost of $11.4 million, with preliminary design and land acquisition funded in part by Proposition 5, which voters approved in 1981. It became a National Recreation Trail in 1996. Rails to Trails Conservancy says it is partly built on the former Alaska Northern Railway, and that its northern end runs beside active Alaska Railroad tracks for a short distance.

The trail follows the shore of Knik Arm and Turnagain Arm of Cook Inlet. It meets the Lanie Fleischer Chester Creek Trail at Westchester Lagoon and passes Earthquake Park and Point Woronzof Park. Its southern end climbs to Kincaid Park, with a significant incline in the last half mile. The Municipality of Anchorage, through its parks and recreation department, maintains the trail. In winter it is used for cross-country skiing and is part of the Tour of Anchorage ski marathon course.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Anchorage Lake Hood Airport, 2.8 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F232733465866686557422925
Low °F101417304150545243311813
Precipitation, in0.60.60.60.40.60.91.82.83.11.71.10.9
Old maps

USGS topographic maps of the trail's middle go back to the 1951 Anchorage sheet (1:250,000); the 1953 Anchorage A-8 sheet (1:63,360) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Two riders mentioned renting bikes for this trail: one rented in August 2023, and another in June 2024 suggested e-bike rentals for a downtown-to-Kincaid Park round trip. r/stories, Jan 2024 · r/anchorage, Jun 2024
  • Two riders reported wildlife: one saw a black bear with cubs near the airport stretch in August 2023, and another said in March 2026 that moose or bears can delay travelers. r/stories, Jan 2024 · r/howislivingthere, Mar 2026
  • One rider said in December 2024 that the trail can be entered at Lyn Ary Park, with beach access off Foraker Drive. r/fatbike, Dec 2024
5 Reddit threads about this trail, Jan 2024 to Mar 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 552920, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Tony Knowles Coastal Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q7822724, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Alaska's Tony Knowles Coastal Trail — Rails to Trails Conservancy · organization · checked Oct 17, 2026
    Supports: 11 miles, endpoints, asphalt, Alaska Northern Railway, rail-with-trail, Chester Creek connection, Earthquake and Point Woronzof parks, incline, municipal maintenance
  5. Tony Knowles Coastal Trail: Anchorage, Alaska — American Planning Association · organization · checked Oct 17, 2026
    Supports: two lanes, 1986-1988 four phases, $11.4 million, Proposition 5, 1996 National Recreation Trail, Knik and Turnagain Arms
  6. Tony Knowles Coastal Trail — Wikipedia · organization · checked Oct 17, 2026
    Supports: named for Tony Knowles, former mayor and governor; winter skiing; Tour of Anchorage

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.