Southern New England Trunkline Trail
Rail-trail in Massachusetts · OpenStreetMap relation
Part of the Blackstone River Greenway (MA)
Runs through Douglas, East Douglas, Uxbridge, Blackstone, Bellingham and Franklin Town · Worcester and Norfolk counties
Conditions now
Loading the weather near Woonsocket…
Forecast by the National Weather Service for Woonsocket · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Southern New England Trunkline Trail (SNETT) is a rail trail in Massachusetts. The trail passes through the towns of Douglas, Uxbridge, Millville, Blackstone, Bellingham, and Franklin and is one of the longest trails in southern Massachusetts. It is designated for use by pedestrians, equestrians and non-motorized vehicles, with motorized off-road vehicles excluded.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at South Street mile 4 directions to trailhead 1
- Parking at Quaker Highway mile 11.9 directions to trailhead 2
- Parking at Adams Lane mile 12 directions to trailhead 3
- Parking at Canal Street mile 15.5 directions to trailhead 4
- Parking at Main Street mile 15.8 directions to trailhead 5
- Parking at Harpin Street mile 18.2 directions to trailhead 6
- Parking at Grove Street mile 22.2 directions to trailhead 7
Plan your visit
- National Recreation TrailDesignated in 1981 National Recreation Trails database
Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
The Southern New England Trunkline Trail (SNETT) is a rail trail in southern Massachusetts owned and managed by the Massachusetts Department of Conservation and Recreation (DCR). DCR gives its length as about 22 miles, from Franklin State Forest west to the Connecticut line in Douglas State Forest; the route mapped here measures about 18 miles. The corridor was acquired in 1984 by DCR's predecessor and designated a National Recreation Trail in 1994. East of Blackstone station it was built as the Norfolk County Railroad and to the west as the Southbridge and Blackstone Railroad; both became part of the New York and New England Railroad, later absorbed by the New Haven Railroad.
At the state line the trail continues into Connecticut as the Air Line State Park Trail. Through Uxbridge, Millville and Blackstone it doubles as the Blackstone River Greenway, which DCR extended half a mile from the St. Paul Street bridge to the Rhode Island border in a $14 million project completed in November 2024. Douglas State Forest charges a daily parking fee, and free parking is available elsewhere. The developed trail ends at Grove Street in Franklin; beyond it the corridor to Union Street still carries active track, and in November 2024 the Franklin Town Council approved plans to buy it for the trail.
The surface is gravel in Douglas (7.4 miles) and Uxbridge (3.6 miles), paved for 3.7 miles through Uxbridge, Millville and Blackstone (opened 2017), and stabilized aggregate in Bellingham and Franklin. Structures include the Triad Bridge over the Blackstone River and the Providence and Worcester Railroad, two concrete arch viaducts, and tunnels at Church Street in Blackstone, Route 126 in Bellingham and Prospect Street in Franklin (2020). Routes 146 and 146A in Uxbridge remain a barrier with no crossing planned. DCR has designed upgrades for the Douglas section but has no construction funds. The trail is open sunrise to sunset; off-road vehicles are prohibited.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 75% of this route as a trail on former railroad right-of-way.
- Shade
75% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Woonsocket, 13 km from the trail's middle, 74 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 38 40 47 60 70 78 84 82 75 64 53 43 Low °F 19 21 28 38 48 57 63 62 54 42 33 25 Precipitation, in 4.4 3.7 4.9 4.7 3.6 4.3 3.6 4 4.2 5.1 4.2 5.3 Snow, in 12.3 10.7 7.6 1.9 0 0 0 0 0 0.1 1 7.9 - On the National Register
- Blackstone Viaduct, Blackstone · structure, listed 2002 · nomination file for Blackstone Viaduct
- Blackstone Canal (Boundary Increase), Providence · structure, listed 1991 · nomination file for Blackstone Canal (Boundary Increase)
- Old maps
USGS topographic maps of the trail's middle go back to the 1886 Blackstone sheet (1:62,500); the 1953 Uxbridge sheet (1:24,000) shows the area at mid-century. Browse all 20 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
What riders say on Reddit
- One rider in February 2024 found pavement, stone dust and rough gravel with washed-out, flooded patches between Franklin and Douglas; another called that stretch harder than Douglas to Putnam, citing the Harris Pond area in Blackstone. r/gravelcycling, Feb 2024 · r/gravelcycling, Feb 2024
- One local rider in February 2024 put Franklin to Douglas and Douglas to Putnam at about 30 to 35 miles round trip each, and expected the road gap near Woonsocket to close that year. r/gravelcycling, Feb 2024
2 Reddit threads about this trail, Feb 2024
- SNETT Saturday r/gravelcycling · Feb 2024 · 4 comments
- SNETT Saturday r/gravelcycling · Feb 2024 · 0 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFranklin & Bellingham Rail Trail Committee
- Trail organizationThompson Trails Committee
- Agency noticesMass DCR: SNETT and Blackstone River Greenway Projects
- RedditSearch Reddit: r/massachusetts
- ForumTrailforks: SNETT End-To-End route
- ForumAllTrails: SNETT (502 reviews)
Nearby trails
- Air Line Trail within 0.2 mi · 55.4 mi, dirt · Connecticut
- Blackstone River Greenway within 0.2 mi · 14.2 mi, paved · Rhode Island
- Canal Towpath 4.4 mi away · 0.7 mi, surface unknown
- Plummer's Trail 4.8 mi away · 0.9 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 7068639, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Southern New England Trunkline Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q7570188, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Southern New England Trunkline Trail — Mass.gov (Massachusetts DCR) · government source · checked Oct 13, 2026 Supports: 22 miles Douglas State Forest to Franklin State Forest, Douglas State Forest daily parking fee and free parking along the trail, sunrise to sunset, no off-road vehicles
- Southern New England Trunkline Trail (SNETT) and Blackstone River Greenway Projects — Mass.gov (Massachusetts DCR) · government source · checked Oct 13, 2026 Supports: DCR ownership, towns, section surfaces and lengths (Douglas 7.4 mi gravel, Uxbridge 3.6 mi gravel, 3.7 mi paved Blackstone River Greenway segment opened 2017, stabilized aggregate in Bellingham and Franklin), Route 146/146A barrier with no current plans, Douglas upgrades designed with no construction funds identified
- DCR Celebrates Completion of Blackstone Section of the Southern New England Trunkline Trail (November 22, 2024) — Mass.gov · government source · checked Oct 13, 2026 Supports: $14 million project completed November 2024, half-mile extension from the St. Paul Street bridge in Blackstone to the Rhode Island border, overlap of SNETT and Blackstone River Greenway
- Southern New England Trunkline Trail — Wikipedia · organization · checked Oct 13, 2026 Supports: 1984 acquisition by DCR predecessor, 1994 National Recreation Trail, Norfolk County Railroad / Southbridge and Blackstone Railroad / New York and New England / New Haven history, Air Line State Park Trail connection, Triad Bridge, viaducts, tunnels incl. Prospect Street 2020, active track east of Grove Street, November 2024 Franklin Town Council approval to buy the Grove–Union Street corridor
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
