States › Alabama

Tuscaloosa City Walk

Greenway in Alabama

Runs through Tuscaloosa · Tuscaloosa County

Conditions now

Loading the weather near Tuscaloosa…

Forecast by the National Weather Service for Tuscaloosa · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.8 mi 4.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at 10th Avenue mile 0.9 directions to trailhead 1
Tuscaloosa, along the trail (opens in a new tab)
Tuscaloosa, along the trail · Photo: Nilson Cain · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Tuscaloosa City Walk is a path in Tuscaloosa, Alabama, tagged in OpenStreetMap for bicycles and pedestrians. The City of Tuscaloosa's CDBG-Disaster Recovery Action Plan, written after the April 27, 2011 tornadoes, describes a greenway proposed to run the length of the tornado path as a multi-use walking and biking trail connecting neighborhoods, named the Citywalk to mirror the existing Riverwalk. The plan proposed building parts of it with the city's disaster-recovery grant: along Alberta Parkway (now 7th Street East) to the new site of Alberta Elementary School, through the Forest Lake community along 1st Avenue and Lake Avenue to 15th Street, and along the 10th Avenue corridor.

The city's disaster-recovery contracts page lists construction contracts, under CDBG-DR 2012 and ADECA 2013, titled Tuscaloosa City Walk 10th Avenue and The Edge/CW Data Center Hub. The mapped line covers about 2.8 miles (4.55 km) in eight pieces. OpenStreetMap names the ways Tuscaloosa City Walk and tags them as concrete cycleways and an asphalt path, with bicycles designated. No fetched page says how much of the proposed route was built.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Northport 2 S, 6.3 km from the trail's middle, 14 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F566168768490929287786658
Low °F353845526068717164534237
Precipitation, in5.15.65.55.445.34.94.23.53.64.85.2
Old maps

USGS topographic maps of the trail's middle go back to the 1924 Tuscaloosa sheet (1:62,500); the 1956 Birmingham sheet (1:250,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. CDBG-Disaster Recovery Action Plan (draft for public review) — City of Tuscaloosa · web · checked Oct 31, 2026
    Supports: greenway proposed along the length of the tornado path as a multi-use walking and biking trail, dubbed the Citywalk to mirror the Riverwalk; the city proposes to build certain areas with its CDBG Disaster Recovery allocation; route along Alberta Parkway (now 7th Street East) to the new site of Alberta Elementary School, through Forest Lake along 1st Avenue and Lake Avenue to 15th Street, and the 10th Avenue corridor; April 27, 2011 tornadoes
  3. Contracts — City of Tuscaloosa · web · checked Oct 31, 2026
    Supports: construction contract entries under CDBG-DR 2012 and ADECA 2013 titled Tuscaloosa City Walk 10th Avenue and The Edge/CW Data Center Hub
  4. Tuscaloosa City Walk — OpenStreetMap way 603221763 · web · checked Oct 31, 2026
    Supports: name Tuscaloosa City Walk; highway=cycleway, bicycle=designated, foot=designated, surface=concrete; part of the mapped line
  5. Tuscaloosa City Walk — OpenStreetMap way 772993643 · web · checked Oct 31, 2026
    Supports: name Tuscaloosa City Walk; highway=path, bicycle=designated, foot=designated, surface=asphalt; part of the mapped line

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.