Tuscaloosa Riverwalk
Greenway in Alabama
Runs through Tuscaloosa · Tuscaloosa County
Conditions now
Loading the weather near Tuscaloosa…
Forecast by the National Weather Service for Tuscaloosa · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Jack Warner Parkway mile 0.3 directions to trailhead 1
- Parking at Jack Warner Parkway mile 0.4 directions to trailhead 2
- Parking at Jack Warner Parkway mile 1.1 directions to trailhead 3
- Parking at Jack Warner Parkway mile 1.4 directions to trailhead 4
- Parking at Jack Warner Parkway mile 1.5 directions to trailhead 5
- Parking at Jack Warner Parkway mile 1.6 directions to trailhead 6
- Parking at Jack Warner Parkway mile 1.6 directions to trailhead 7
- Parking at Greensboro Avenue mile 2 · water directions to trailhead 8
(opens in a new tab) About this trail
The Tuscaloosa Riverwalk is a paved path for walkers and bikers along the Black Warrior River near downtown Tuscaloosa, Alabama, which the City of Tuscaloosa plans to extend and connect. Tuscaloosa Thread, quoting archival Tuscaloosa News coverage, reports that the first section opened in 2002, and describes the multi-mile path as passing downtown, the River Market and the southern edge of the University of Alabama campus. The Tuscaloosa News described the existing path in January 2022 as extending from Capitol Park on 28th Avenue to areas just west of the university's Park at Manderson Landing, near the intersection of Jack Warner Parkway and Hackberry Lane. The University of Alabama's news site gives its length as 4.5 miles (7.2 km) and lists it as open daily at 2710 Jack Warner Parkway.
The city held a ribbon cutting on Thursday, May 2, 2024, for the Western Riverwalk, a shared-use riverwalk from the Oliver Lock and Dam to the Mercedes-Benz Amphitheater, after breaking ground on May 8, 2023. The groundbreaking announcement says it will connect to the current Riverwalk near the Tuscaloosa Amphitheater once the third phase of the Martin Luther King Jr. Boulevard and Jack Warner Parkway project is finished. In January 2022 the Tuscaloosa News reported the opening of an 0.6-mile section of the Northern Riverwalk, called Phase 1, anchored at a trailhead at 201 Rice Mine Road Loop. In November 2025 Tuscaloosa Thread reported that the city plans to connect the three segments; the City Engineer said the result would be about a 9.2-mile Riverwalk from Western Riverwalk Park to Bluegrass Parkway, and outlined how it could come together by 2030.
The mapped line covers about 2.0 miles (3.2 km) along the river in two pieces. OpenStreetMap tags the ways as cycleways with bicycles designated, asphalt or concrete, lit, about 10 feet (3 m) wide, some of them on bridges.
Sources checked Oct 31, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
38% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Northport 2 S, 3.2 km from the trail's middle, 0 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 61 68 76 84 90 92 92 87 78 66 58 Low °F 35 38 45 52 60 68 71 71 64 53 42 37 Precipitation, in 5.1 5.6 5.5 5.4 4 5.3 4.9 4.2 3.5 3.6 4.8 5.2 - On the National Register
- Queen City Pool and Pool House, Tuscaloosa · historic district, listed 1992 · nomination file for Queen City Pool and Pool House
- Old maps
USGS topographic maps of the trail's middle go back to the 1924 Tuscaloosa sheet (1:62,500); the 1956 Birmingham sheet (1:250,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Tuscaloosa City Walk 1.8 mi away · 2.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- 5 Off-Campus Spots to Get Your Steps In — University of Alabama News · organization · checked Oct 31, 2026 Supports: Riverwalk described as a paved trail along the Black Warrior River near downtown Tuscaloosa; 4.5 miles of two-way sidewalk for walkers and bikers; 2710 Jack Warner Pkwy; open daily
- Plans Underway to Unite Tuscaloosa's Riverwalks, Creating Unbroken 9-Mile Path — Tuscaloosa Thread (November 7, 2025) · web · checked Oct 31, 2026 Supports: first section opened in 2002 (archival coverage quoted); the multi-mile path passes downtown, the River Market and the southern edge of the University of Alabama campus; the city plans to connect the three segments and extend the path where it ends; City Engineer's figure of about 9.2 miles from Western Riverwalk Park to Bluegrass Parkway; could come together by 2030
- New trailhead, phase of Riverwalk officially opens in north Tuscaloosa — The Tuscaloosa News via Yahoo (January 6, 2022) · web · checked Oct 31, 2026 Supports: existing Riverwalk extending from Capitol Park on 28th Avenue to areas just west of the University of Alabama's Park at Manderson Landing, near Jack Warner Parkway and Hackberry Lane; 0.6-mile section of the Northern Riverwalk, called Phase 1, anchored at the trailhead at 201 Rice Mine Road Loop, celebrated with a ribbon cutting and dedication
- City of Tuscaloosa Holds Ribbon Cutting for Western Riverwalk — City of Tuscaloosa (May 3, 2024) · web · checked Oct 31, 2026 Supports: Western Riverwalk is a shared-use riverwalk from the Oliver Lock and Dam to the Mercedes-Benz Amphitheater; ribbon cutting Thursday, May 2
- Western Riverwalk Groundbreaking — Elevate Tuscaloosa · web · checked Oct 31, 2026 Supports: the City of Tuscaloosa broke ground on the Western Riverwalk on Monday, May 8, 2023; once the third phase of the Martin Luther King Jr. Blvd./Jack Warner Pkwy. project is finished, it will connect to the current Riverwalk near the Tuscaloosa Amphitheater
- Tuscaloosa Riverwalk — OpenStreetMap way 130506719 · web · checked Oct 31, 2026 Supports: ways named Tuscaloosa Riverwalk tagged highway=cycleway, bicycle=designated, foot=designated, lit=yes, width=3, surface asphalt or concrete (the mapped line); other ways of the line carry bridge=yes
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.