States › North Carolina

Walker Branch Greenway

Greenway in North Carolina · OpenStreetMap relation

Runs through Charlotte · Mecklenburg County

Conditions now

Loading the weather near Charlotte…

Forecast by the National Weather Service for Charlotte · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Walkers Creek Drive mile 0.5 directions to trailhead 1
  2. Parking at Rivergate Parkway mile 0.8 directions to trailhead 2
  3. Parking at South Tryon Street mile 1 directions to trailhead 3
  4. Parking at South Tryon Street mile 1 directions to trailhead 4
  5. Parking at Rivergate Parkway mile 1 directions to trailhead 5
  6. Parking at South Tryon Street mile 1 directions to trailhead 6
  7. Parking at Rivergate Parkway mile 1 directions to trailhead 7
Walker Branch Greenway drawn on the 1968 USGS topographic map of Fort Mill, South Carolina
Then: the 1968 USGS Fort Mill sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Walker Branch Greenway is a Mecklenburg County Park and Recreation greenway in Charlotte, North Carolina, following the Walker Branch stream on both sides of South Tryon Street (Highway 49) near Rivergate Parkway. It is not a rail-trail. The county's greenway list gives the Walker Branch and Hoover Creek greenways as 1.1 miles from South Tryon Street to Smith Road, with the nearby Hoover Creek Greenway another 0.2 miles.

A county project, the Walker Branch and Hoover Creek Greenway, extends the trail from Sledge Road to South Tryon Street and from the existing Hoover Creek Greenway to Rivergate Parkway, closing gaps between existing sections. The county says the work adds about a mile and a half and gives visitors more than two miles of connected greenway. A preliminary alignment study was done in summer 2020, a pre-construction meeting was held in spring 2024, and work on the Walker Branch segment began in spring 2025; the fall 2025 update reported grading, base course and paving under way and bridges and boardwalks being finished. No opening announcement was found.

This record maps about 1.9 miles in OpenStreetMap, from Smith Road northwest across South Tryon Street to Sledge Road near Steele Creek Road, so it includes the new section. The path is mapped as asphalt with concrete stretches and a bridge, a push-button signalized crossing, and parking near Walkers Creek Drive, Rivergate Parkway and South Tryon Street.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

51% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and September to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Rock Hill York County Airport, 14.7 km from the trail's middle, 25 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F525664748087908983736355
Low °F313440485766696862493933
Precipitation, in3.53.13.83.53.24443.433.23.6
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Charlotte sheet (1:48,000); the 1968 Fort Mill sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 11793538, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Greenways — Mecklenburg County Park and Recreation · government source · checked Oct 16, 2026
    Supports: Walker Branch and Hoover Creek Greenways: 1.1 miles from S. Tryon Street to Smith Road; nearby Hoover Creek Greenway 0.2 miles; county greenway system
  3. Walker Branch & Hoover Creek Greenway — Mecklenburg County Community Relations (PublicInput) · government source · checked Oct 16, 2026
    Supports: project extends from Sledge Road to South Tryon Street (Hwy. 49) and from the existing Hoover Creek Greenway to Rivergate Parkway, closing gaps; adds about a mile and a half; over two miles of greenway in all; summer 2020 preliminary alignment assessment; spring 2024 pre-construction meeting; Walker Branch segment construction began spring 2025; fall 2025 status (grading, base course, paving; bridges and boardwalks being finalized)
  4. Walker Branch Greenway (relation 11793538) — OpenStreetMap · web · checked Oct 16, 2026
    Supports: record length of about 1.9 miles from Smith Road to Sledge Road near Steele Creek Road, crossing South Tryon Street; follows the Walker Branch stream; asphalt with concrete sections and a bridge; signalized push-button crossing; parking near Walkers Creek Drive, Rivergate Parkway and South Tryon Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.