Westinghouse Blvd Shared Use Path
Greenway in North Carolina
Runs through Charlotte · Mecklenburg County
Conditions now
Loading the weather near Charlotte…
Forecast by the National Weather Service for Charlotte · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Westinghouse Boulevard mile 1.3 directions to trailhead 1
- Parking at Westinghouse Boulevard mile 1.4 directions to trailhead 2
- Parking at Westinghouse Boulevard mile 1.5 directions to trailhead 3
- Parking at Westinghouse Boulevard mile 1.8 directions to trailhead 4
- Parking at Westinghouse Boulevard mile 1.9 directions to trailhead 5
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Westinghouse Blvd Shared Use Path is a concrete side path along Westinghouse Boulevard in southwest Charlotte, North Carolina. It is not a rail-trail. The name used here comes from OpenStreetMap, which maps about 1.3 miles of path in several pieces over a stretch of about 2 miles, beginning at Steele Creek Road (NC 160) at its western end and running east beside the boulevard. The mapped path is designated for both bicycles and pedestrians and is not split into separate lanes for each.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Charlotte Douglas Airport, 10.2 km from the trail's middle, 38 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 52 57 64 73 80 87 90 89 83 73 63 55 Low °F 32 35 41 49 58 66 70 69 63 50 40 34 Precipitation, in 3.5 3.1 4 3.8 3.4 4 3.7 4.3 3.7 3.2 3.3 3.6 Snow, in 1.6 1.1 0.3 0 0 0 0 0 0 0 0.1 0.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1905 Charlotte sheet (1:48,000); the 1949 Charlotte West sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Walker Branch Greenway 1.5 mi away · 1.9 mi, paved
- Cross Charlotte Trail 4.3 mi away · 22.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Westinghouse Blvd Shared Use Path — OpenStreetMap way 1221469157 (one of the record's ways) — OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: name; concrete; bicycle and foot designated; not segregated; mapped pieces of about 1.3 miles from Steele Creek Road (NC 160) eastward along Westinghouse Boulevard
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.