States › Wisconsin

West Towne Path

Greenway in Wisconsin

Runs through Madison · Dane County

Conditions now

Loading the weather near Madison…

Forecast by the National Weather Service for Madison · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at South Whitney Way mile 0 directions to trailhead 1
  2. Parking at South Whitney Way mile 0 directions to trailhead 2
  3. Parking at Schroeder Road mile 0.1 directions to trailhead 3
  4. Parking at Schroeder Road mile 0.1 directions to trailhead 4
  5. Parking at Medical Circle mile 0.1 directions to trailhead 5
  6. Parking at Medical Circle mile 0.1 directions to trailhead 6
  7. Parking at Medical Circle mile 0.1 directions to trailhead 7
  8. Parking at Medical Circle mile 0.1 directions to trailhead 8
  9. Parking at Medical Circle mile 0.1 directions to trailhead 9
  10. Parking at Schroeder Court mile 0.2 directions to trailhead 10
  11. Parking at Schroeder Court mile 0.2 directions to trailhead 11
  12. Parking at Schroeder Court mile 0.2 directions to trailhead 12
  13. Parking at Medical Circle mile 0.2 directions to trailhead 13
  14. Parking at Medical Circle mile 0.2 directions to trailhead 14
  15. Parking at Medical Circle mile 0.2 directions to trailhead 15
  16. Parking at Odana Road mile 0.2 directions to trailhead 16
  17. Parking at Odana Road mile 0.2 directions to trailhead 17
  18. Parking at Odana Road mile 0.3 directions to trailhead 18
  19. Parking at Medical Circle mile 0.3 directions to trailhead 19
  20. Parking at Kessel Court mile 0.3 directions to trailhead 20
  21. Parking at Odana Road mile 0.3 directions to trailhead 21
  22. Parking at Odana Road mile 0.4 directions to trailhead 22
  23. Parking at Odana Road mile 0.4 directions to trailhead 23
  24. Parking at Odana Road mile 0.5 directions to trailhead 24
  25. Parking at Odana Road mile 0.6 directions to trailhead 25
  26. Parking at Odana Road mile 0.6 directions to trailhead 26
  27. Parking at Odana Road mile 0.6 directions to trailhead 27
  28. Parking at Odana Road mile 0.9 directions to trailhead 28
  29. Parking at Odana Road mile 1.2 directions to trailhead 29
  30. Parking at Grand Canyon Drive mile 1.3 directions to trailhead 30
  31. Parking at Grand Canyon Drive mile 1.3 directions to trailhead 31
  32. Parking at Point Place mile 2.3 directions to trailhead 32
  33. Parking at South High Point Road mile 2.4 directions to trailhead 33
West Beltline Bike Path (opens in a new tab)
West Beltline Bike Path · Photo: vgxhc · CC BY-SA 4.0 · Mapillary

About this trail

The West Towne Path, mapped here as the West Beltline Bike Path, is a shared-use path beside the West Beltline Highway on the far west side of Madison, Wisconsin, north of the highway near West Towne Mall. The City of Madison Engineering Division is building it in phases as a long-term goal of connecting the far west side to the rest of the city's bike network; when finished it is to form a continuous path between Junction Road and Whitney Way.

The path runs as 10-foot-wide asphalt, with underpasses at South High Point Road and Gammon Road. Phase 2a, an approximately 0.3-mile segment from the High Point Road underpass east to Zor Shrine Place, was built by the contractor Parisi in spring 2025 and declared complete that September; it also added a north-south link to the Zor Shrine Place cul-de-sac. Part of that segment lies on Wisconsin Department of Transportation highway right-of-way.

A gap remains between Zor Shrine Place and South Gammon Road, leaving two disconnected segments north of the Beltline. The city's Phase 2b project would fill it with about 2,300 feet of 10-foot asphalt path, lighting, signage and retaining walls on the steep side slopes. A public meeting was held on April 9, 2026; the city schedules design and bidding for 2026 to 2027 and construction for spring 2028, and the project also needs state transportation department approval. City staff have discussed further connections to the Madison School and Community Recreation campus and the West Towne shopping center.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Charmany Farm, 1.1 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F263143566878828072604532
Low °F101324354758626052392716
Precipitation, in1.51.62.44.14.65.54.74.13.62.92.22
Snow, in10.110.65.51.6000000.32.28.2
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Madison sheet (1:62,500); the 1959 Madison West sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Look around

360° panorama: West Towne Path (opens in a new tab)
360° panorama · Photo: vgxhc · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. West Towne Path- Phase 2a | Engineering | City of Madison, WI · government source · checked Oct 15, 2026
    Supports: West Towne Path corridor, long-term goal to connect far west side, 0.3-mile 10-foot asphalt path from High Point Road underpass to Zor Shrine Place, north-south link, WisDOT right-of-way, Gammon Road underpass, contractor Parisi, April 2025 start, complete per September 5, 2025 update
  3. West Towne Shared-Use Path - Phase 2b | Engineering | City of Madison, WI · government source · checked Oct 15, 2026
    Supports: final connection between Zor Shrine Place and S. Gammon Road, continuous path between Junction Road and Whitney Way, 2,300 feet of 10-foot asphalt, lighting, signage, retaining walls, April 9, 2026 meeting, design/bidding 2026-2027, construction spring 2028
  4. Madison planners aim to close bike path gap near West Towne Mall - Cap Times (April 14, 2026) · press · checked Oct 15, 2026
    Supports: near West Towne Mall, two disconnected segments north of the Beltline, state DOT approval needed, possible connections to MSCR campus and West Towne shopping center

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.