Buckeye Basin Trail
Greenway in Ohio
Runs through Toledo · Lucas County
Conditions now
Loading the weather near Toledo…
Forecast by the National Weather Service for Toledo · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Spielbusch Avenue mile 0 directions to trailhead 1
- Parking at North Michigan Street mile 0 directions to trailhead 2
- Parking at Buckeye Street mile 1.8 directions to trailhead 3
- Parking at Buckeye Street mile 1.9 directions to trailhead 4
Plan your visit
- By trainAmtrak: Toledo, OH (TOL) 1.5 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Buckeye Basin Trail is a shared bicycle and pedestrian path in Toledo, Ohio, beside the Greenbelt Parkway north of downtown. OpenStreetMap maps it as a designated cycleway, two-way and open to both cyclists and walkers. The Greenbelt Parkway is the four-lane divided stretch of State Route 25 that begins after the route meets Cherry Street at Spielbusch Avenue and turns northeast; it is cut off at Interstate 280 and ends northeast of that interchange at Galena Street, near the Toledo Correctional Institute.
The section mapped here is about 2.8 miles long. It starts near Spielbusch Avenue and North Michigan Street and runs northeast along the parkway to Buckeye Street. A Toledo community wiki describes the Greenbelt bike path as starting at Cherry Street and the parkway: one branch makes a small loop around the Skyway on-ramp, while the other crosses the parkway, weaves among the columns of the Veterans' Glass City Skyway and continues across the Craig Memorial Bridge.
The same wiki says Forest Cemetery borders the path on one side. On the side toward the Skyway lies a drainage ditch that deepens nearer the Skyway and collects litter; the land on the other side is marshy, floods in spring and holds squirrels, birds, field mice, snakes and deer.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
18% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Toledo Metcalf Field, 12.5 km from the trail's middle, 14 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 36 46 60 71 81 85 82 76 64 50 38 Low °F 20 22 29 40 51 61 65 63 55 45 34 26 Precipitation, in 1.8 1.8 2.3 3.3 3.5 3.2 3.2 3.5 3.1 2.4 2.3 2.1 - On the National Register
- Vistula Historic District, Toledo · historic district, listed 1978 · nomination file for Vistula Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1900 Toledo sheet (1:62,500); the 1952 Toledo sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Riverside Trail within 0.2 mi · 2.2 mi, paved
- Riverside Trail East 0.5 mi away · 2.9 mi, paved
- Overland Trail 1.0 mi away · 4.0 mi, paved
- Robert Brundage Bike Path 2.9 mi away · 2.7 mi, paved
- Exercise Trail 3.7 mi away · 2.9 mi, crushed stone
- Chessie Circle Trail 3.7 mi away · 4.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Ohio State Route 25 — Wikipedia · organization · checked Oct 14, 2026 Supports: Greenbelt Parkway as the four-lane divided stretch of SR 25 after Cherry Street meets it at Spielbusch Avenue and the route turns northeast, cut off at I-280, ending northeast of the interchange at Galena Street near the Toledo Correctional Institute
- Greenbelt Bike Path — Toledo LocalWiki · organization · checked Oct 14, 2026 Supports: path along the Greenbelt Parkway starting at Cherry Street, loop around the Skyway on-ramp, branch among the Skyway columns and across the Craig Memorial Bridge, Forest Cemetery, drainage ditch, marshy land that floods in spring, wildlife
- Buckeye Basin Trail — OpenStreetMap way 91905571 · web · checked Oct 14, 2026 Supports: name, designated cycleway for bicycles and pedestrians, two-way, not segregated; mapped section of about 2.8 miles from Spielbusch Avenue and North Michigan Street to Buckeye Street
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.