States › Ohio

Buckeye Basin Trail

Greenway in Ohio

Runs through Toledo · Lucas County

Conditions now

Loading the weather near Toledo…

Forecast by the National Weather Service for Toledo · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.8 mi 4.5 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Spielbusch Avenue mile 0 directions to trailhead 1
  2. Parking at North Michigan Street mile 0 directions to trailhead 2
  3. Parking at Buckeye Street mile 1.8 directions to trailhead 3
  4. Parking at Buckeye Street mile 1.9 directions to trailhead 4

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Riverview Apartments, beside the trail (opens in a new tab)
Riverview Apartments, beside the trail · Photo: Nyttend · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Buckeye Basin Trail is a shared bicycle and pedestrian path in Toledo, Ohio, beside the Greenbelt Parkway north of downtown. OpenStreetMap maps it as a designated cycleway, two-way and open to both cyclists and walkers. The Greenbelt Parkway is the four-lane divided stretch of State Route 25 that begins after the route meets Cherry Street at Spielbusch Avenue and turns northeast; it is cut off at Interstate 280 and ends northeast of that interchange at Galena Street, near the Toledo Correctional Institute.

The section mapped here is about 2.8 miles long. It starts near Spielbusch Avenue and North Michigan Street and runs northeast along the parkway to Buckeye Street. A Toledo community wiki describes the Greenbelt bike path as starting at Cherry Street and the parkway: one branch makes a small loop around the Skyway on-ramp, while the other crosses the parkway, weaves among the columns of the Veterans' Glass City Skyway and continues across the Craig Memorial Bridge.

The same wiki says Forest Cemetery borders the path on one side. On the side toward the Skyway lies a drainage ditch that deepens nearer the Skyway and collects litter; the land on the other side is marshy, floods in spring and holds squirrels, birds, field mice, snakes and deer.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

18% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Toledo Metcalf Field, 12.5 km from the trail's middle, 14 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343646607181858276645038
Low °F202229405161656355453426
Precipitation, in1.81.82.33.33.53.23.23.53.12.42.32.1
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1900 Toledo sheet (1:62,500); the 1952 Toledo sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Ohio State Route 25 — Wikipedia · organization · checked Oct 14, 2026
    Supports: Greenbelt Parkway as the four-lane divided stretch of SR 25 after Cherry Street meets it at Spielbusch Avenue and the route turns northeast, cut off at I-280, ending northeast of the interchange at Galena Street near the Toledo Correctional Institute
  3. Greenbelt Bike Path — Toledo LocalWiki · organization · checked Oct 14, 2026
    Supports: path along the Greenbelt Parkway starting at Cherry Street, loop around the Skyway on-ramp, branch among the Skyway columns and across the Craig Memorial Bridge, Forest Cemetery, drainage ditch, marshy land that floods in spring, wildlife
  4. Buckeye Basin Trail — OpenStreetMap way 91905571 · web · checked Oct 14, 2026
    Supports: name, designated cycleway for bicycles and pedestrians, two-way, not segregated; mapped section of about 2.8 miles from Spielbusch Avenue and North Michigan Street to Buckeye Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.