States › Ohio

Riverside Trail East

Greenway in Ohio

Runs through Toledo · Lucas County

Conditions now

Loading the weather near Toledo…

Forecast by the National Weather Service for Toledo · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.9 mi 4.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Miami Street mile 0 directions to trailhead 1
  2. Parking at Jay Street mile 0.1 directions to trailhead 2
  3. Parking at Jay Street mile 0.1 directions to trailhead 3
  4. Parking at Boers-Boyer Way mile 0.4 directions to trailhead 4
  5. Parking at Boers-Boyer Way mile 0.8 directions to trailhead 5
  6. Parking at Riverside Drive mile 1.1 directions to trailhead 6
  7. Parking at Front Street mile 1.1 directions to trailhead 7
  8. Parking at Front Street mile 1.1 directions to trailhead 8
  9. Parking at Front Street mile 1.2 directions to trailhead 9
  10. Parking at Front Street mile 1.3 · restrooms directions to trailhead 10
  11. Parking at Front Street mile 1.3 · restrooms directions to trailhead 11
  12. Parking at Front Street mile 1.5 directions to trailhead 12
  13. Parking at Millard Avenue mile 4.4 directions to trailhead 13

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Toledo, along the trail (opens in a new tab)
Toledo, along the trail · Photo: Chris Rycroft from Madison, Wisconsin, United States · CC BY 2.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Riverside Trail East is the name OpenStreetMap gives to a set of paved paths on the east bank of the Maumee River in East Toledo, Ohio, opposite the Riverside Trail on the downtown bank. Toledo's 2015 bike plan, as reported by The Blade, envisioned a Riverside Trail paralleling the river from Maumee to Cullen Park in Point Place. Most of the east-bank path now lies in the Glass City Riverwalk, a Metroparks Toledo greenway along both banks between the Anthony Wayne Bridge and the Craig Street (I-280) Bridge.

As mapped, the paths total about 2.9 miles in several pieces, running north from Miami Street near the Anthony Wayne Bridge along Boers-Boyer Way and the riverfront, through Glass City Metropark and along Front Street, with a separate piece near Millard Avenue farther downriver. Beginning in May 2021, Metroparks Toledo built a 110-foot, 20-foot-wide pedestrian and bicycle bridge over Main Street, on the site of a former railroad bridge, to link the path through International Park with Glass City Metropark, together with a 0.7-mile, 12-foot-wide asphalt bike path from Main Street to Marina Drive. That project cost nearly $2 million, 80 percent of it from a federal grant secured by the Toledo Metropolitan Area Council of Governments.

Glass City Metropark opened its second phase in June 2023. The former International Park, between the Cherry Street and Anthony Wayne bridges, is in conceptual design as the park's third phase. OpenStreetMap shows asphalt and concrete surfaces.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Toledo Metcalf Field, 10.6 km from the trail's middle, 7 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343646607181858276645038
Low °F202229405161656355453426
Precipitation, in1.81.82.33.33.53.23.23.53.12.42.32.1
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1900 Toledo sheet (1:62,500); the 1952 Toledo sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Bridge Will Connect Riverfront Parks — Metroparks Toledo (2021) · web · checked Oct 14, 2026
    Supports: Main Street pedestrian and bicycle bridge (110 ft long, 20 ft wide, site of a former railroad bridge) linking International Park with Glass City Metropark, 0.7-mile 12-foot asphalt bike path from Main Street to Marina Drive, nearly $2 million with 80 percent federal grant via TMACOG, construction from May 2021
  3. Glass City Metropark — Metroparks Toledo · web · checked Oct 14, 2026
    Supports: Phase 2 opened June 2023, park is part of the larger Glass City Riverwalk
  4. BUILD — Glass City Riverwalk (Metroparks Toledo) · web · checked Oct 14, 2026
    Supports: Glass City Riverwalk between the Anthony Wayne Bridge and the Craig Street Bridge (I-280) on both sides of the Maumee River
  5. Glass City (Former International Park) — Glass City Riverwalk (Metroparks Toledo) · web · checked Oct 14, 2026
    Supports: former International Park between the Cherry Street bridge and the Anthony Wayne Bridge, in conceptual design as Glass City Metropark Phase 3
  6. Short path start of ambitious bike plan — The Blade (November 16, 2015) · web · checked Oct 14, 2026
    Supports: 2015 Toledo Bike Plan's Riverside Trail paralleling the river from Maumee to Cullen Park in Point Place
  7. Riverside Trail East — OpenStreetMap ways (e.g. way 354368946) · web · checked Oct 14, 2026
    Supports: name Riverside Trail East, route from Miami Street along Boers-Boyer Way, Glass City Metropark and Front Street, separate piece near Millard Avenue, about 2.9 miles in several pieces, asphalt and concrete surfaces

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.