States › North Carolina

Centennial Bikeway Connector

Greenway in North Carolina · OpenStreetMap relation

Runs through Raleigh · Wake County

Conditions now

Loading the weather near Raleigh…

Forecast by the National Weather Service for Raleigh · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.3 mi 3.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Centennial Parkway mile 0.1 directions to trailhead 1
  2. Parking at Centennial Parkway mile 0.2 directions to trailhead 2
  3. Parking at Farmers Market Drive mile 0.3 directions to trailhead 3
  4. Parking at Farmers Market Drive mile 0.3 directions to trailhead 4
  5. Parking at Centennial Parkway mile 0.4 directions to trailhead 5
  6. Parking at The Greens Circle mile 0.9 directions to trailhead 6
  7. Parking at The Greens Circle mile 0.9 directions to trailhead 7
  8. Parking at The Greens Circle mile 0.9 directions to trailhead 8
  9. Parking at The Greens Circle mile 0.9 directions to trailhead 9
  10. Parking at The Greens Circle mile 0.9 directions to trailhead 10
  11. Parking at The Greens Circle mile 0.9 directions to trailhead 11
  12. Parking at The Greens Circle mile 0.9 directions to trailhead 12
  13. Parking at The Greens Circle mile 0.9 directions to trailhead 13
  14. Parking at Centennial Parkway mile 1.4 directions to trailhead 14
  15. Parking at Initiative Way mile 1.4 directions to trailhead 15
  16. Parking at Centennial Parkway mile 1.5 directions to trailhead 16
  17. Parking at Initiative Way mile 1.5 directions to trailhead 17
  18. Parking at Oval Drive mile 1.6 directions to trailhead 18
  19. Parking at Centennial Parkway mile 1.6 directions to trailhead 19
  20. Parking at Centennial Parkway mile 1.7 directions to trailhead 20
  21. Parking at Oval Drive mile 1.7 directions to trailhead 21
  22. Parking at Centennial Parkway mile 1.7 directions to trailhead 22
  23. Parking at Centennial Parkway mile 1.8 directions to trailhead 23
  24. Parking at Nazareth Street mile 1.8 directions to trailhead 24
  25. Parking at Nazareth Street mile 1.8 directions to trailhead 25
Main Campus Drive Bridge Walnut Creek Lake Raleigh NC 0535 (opens in a new tab)
Main Campus Drive Bridge Walnut Creek Lake Raleigh NC 0535 · Photo: bobistraveling · CC BY · Flickr

About this trail

The Centennial Bikeway Connector is a multi-purpose path in Raleigh, North Carolina, listed in the City of Raleigh's table of trails in the Capital Area Greenway system. The city describes it as adjacent to Centennial Parkway on the NC State University Centennial Campus and on the south side of Western Boulevard, and gives its length as 2.5 miles (4 km); the mapped line covers about 2.3 miles (3.7 km). The city's Walnut Creek Trail page lists the connector among that trail's connections and names a farmers market at the connector. In OpenStreetMap the path is asphalt and concrete, tagged designated for bicycles, with signalized road crossings, and is mapped as a bicycle route relation.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

30% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Raleigh State Univ, 3.9 km from the trail's middle, 28 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F525563728087918982726255
Low °F323340495866706963514135
Precipitation, in3.62.94.23.644.94.74.75.73.93.53.7
Snow, in2.50.80.100000000.11
Old maps

USGS topographic maps of the trail's middle go back to the 1943 Raleigh sheet (1:62,500); the 1968 Raleigh West sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12395209, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Trails — City of Raleigh · government source · checked Oct 31, 2026
    Supports: Capital Area Greenway system; trails table lists Centennial Bikeway Connector at 2.5 miles, a multi-purpose path adjacent to Centennial Pkwy on the NC State University Centennial Campus and on the south side of Western Blvd
  3. Walnut Creek Greenway Trail — City of Raleigh · government source · checked Oct 31, 2026
    Supports: Walnut Creek Trail provides connections with the Centennial Bikeway Connector; one segment lists a Farmer's Market at Centennial Bikeway Connector among its connections
  4. Centennial Bikeway Connector — OpenStreetMap · web · checked Oct 31, 2026
    Supports: route=bicycle relation named Centennial Bikeway Connector, 16 member ways; ways tagged bicycle=designated, surface asphalt or concrete, with traffic_signals on the crossing ways

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.