Little Rock Trail
Greenway in North Carolina · OpenStreetMap relation
Runs through Raleigh · Wake County
Conditions now
Loading the weather near Raleigh…
Forecast by the National Weather Service for Raleigh · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Peterson Street mile 0 directions to trailhead 1
- Parking at Bragg Street mile 0.3 directions to trailhead 2
- Parking at Bragg Street mile 0.3 directions to trailhead 3
- Parking at Chavis Way mile 0.9 directions to trailhead 4
- Parking at East Cabarrus Street mile 1.2 directions to trailhead 5
- Parking at East Davie Street mile 1.3 directions to trailhead 6
- Parking at East Davie Street mile 1.3 directions to trailhead 7
- Parking at South East Street mile 1.3 directions to trailhead 8
- Parking at South East Street mile 1.4 directions to trailhead 9
- Parking at East Hargett Street mile 1.5 directions to trailhead 10
- Parking at Woodsborough Place mile 1.5 directions to trailhead 11
Plan your visit
- By trainAmtrak: Raleigh, NC (RGH) 0.9 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Little Rock Trail is a paved greenway of about 1.8 miles in Raleigh, North Carolina, part of the city's greenway system. It is not a rail-trail. The City of Raleigh describes it following Little Rock Creek between downtown and Walnut Creek Wetland Park, with connections to City Cemetery, John Chavis Memorial Park and the Walnut Creek Greenway Trail.
TrailLink, which gives the length as 1.6 miles, describes the route from East Hargett Street, across from City Cemetery, south through John Winters Park and Chavis Park along the creek and parallel to Chavis Way, then through a corridor between neighborhoods and businesses to Peterson Street, where it meets the Walnut Creek Trail opposite the Walnut Creek Wetland Center. Chavis Park has a carousel built in 1937.
The surface is asphalt and concrete. The city lists parking at 501 Martin Luther King Jr. Boulevard, 512 East Davie Street and 720 Chavis Way, and its greenway trails are open from dawn to dusk.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
39% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Raleigh State Univ, 6.6 km from the trail's middle, 45 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 52 55 63 72 80 87 91 89 82 72 62 55 Low °F 32 33 40 49 58 66 70 69 63 51 41 35 Precipitation, in 3.6 2.9 4.2 3.6 4 4.9 4.7 4.7 5.7 3.9 3.5 3.7 Snow, in 2.5 0.8 0.1 0 0 0 0 0 0 0 0.1 1 - On the National Register
- Chavis, John, Memorial Park, Raleigh · historic district, listed 2016
- East Raleigh--South Park Historic District, Raleigh · historic district, listed 1990 · nomination file for East Raleigh--South Park Historic District
- Oakwood Historic District (Boundary Increase II), Raleigh · historic district, listed 1988 · nomination file for Oakwood Historic District (Boundary Increase II)
- Old maps
USGS topographic maps of the trail's middle go back to the 1943 Raleigh sheet (1:62,500); the 1968 Raleigh West sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Walnut Creek Trail within 0.2 mi · 13.8 mi, paved
- Rocky Branch Trail 0.7 mi away · 4.8 mi, paved
- Centennial Bikeway Connector 1.7 mi away · 2.3 mi, paved
- Crabtree Creek Trail 2.2 mi away · 17.7 mi, paved
- Reedy Creek Trail 3.2 mi away · 5.3 mi, paved
- House Creek Trail 3.6 mi away · 3.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9723672, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Little Rock Greenway Trail — City of Raleigh · government source · checked Oct 17, 2026 Supports: 1.8 miles; paved; follows Little Rock Creek between Walnut Creek Wetland Park and downtown; connects to City Cemetery, John Chavis Memorial Park, Walnut Creek Greenway Trail; parking at 501 MLK Blvd, 512 E Davie St, 720 Chavis Way; open dawn to dusk
- Little Rock Trail — TrailLink · web · checked Oct 17, 2026 Supports: 1.6 miles; asphalt and concrete; E Hargett St across from City Cemetery south through John Winters Park and Chavis Park, parallel to Chavis Way; meets Walnut Creek Trail at Peterson Street opposite the Wetland Center; 1937 carousel
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.