Clarksburg Branch Line Trail
Rail-trail in California
Runs through West Sacramento · Yolo County
Conditions now
Loading the weather near West Sacramento…
Forecast by the National Weather Service for West Sacramento · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 3.1 directions to trailhead 1
(opens in a new tab) About this trail
Clarksburg Path is the OpenStreetMap name for the Clarksburg Branch Line Trail, a rail-trail for walking and cycling in West Sacramento, Yolo County, California, built by the City of West Sacramento on the former Clarksburg branch railroad. In 2004 the city approved acquiring 10 miles of the Clarksburg line from the Sierra Northern Railway Company and developing a multi-use trail on a 3.25-mile segment of the corridor, with a further one-mile trail easement to the south.
Visit the California Delta describes the trail as extending about 4.3 miles from South River Road to the southern limit of the city, giving access to Southport Town Center, River City High School and the West Sacramento Recreation Center, and counts it as one of the West Sacramento segments of the Great California Delta Trail. This record maps about 4.3 miles from near Marina Greens Drive in the north to the Riverview area at the south end of the city.
The same page lists 1.3 miles as paved. In February 2025 the city filed a notice of exemption for a project to pave about 2.2 miles of the existing gravel path along the former branch line, from which the rails have been removed, and to add a 600-foot segment along South River Road with a grade-separated crossing of that road; both sections would connect to the newly built Southport Levee Recreation Trail. The finished trail is to meet Class I bikeway standards. OpenStreetMap maps the record's ways as asphalt, but whether the 2025 paving has been completed could not be confirmed.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Sacramento Executive Airport, 5.1 km from the trail's middle, 0 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 61 66 72 80 88 93 92 88 79 65 56 Low °F 39 42 44 47 52 56 59 59 56 50 43 38 Precipitation, in 3.7 3.5 2.7 1.3 0.8 0.2 0 0 0.1 0.8 1.7 3.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1907 Davisville sheet (1:62,500); the 1949 Sacramento West sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Sacramento River Bike Trail 0.8 mi away · 6.2 mi, paved
- Del Rio Trail 1.4 mi away · 5.1 mi, paved
- American River Bike Trail 2.1 mi away · 36.5 mi, paved
- Two Rivers Bike Trail 3.0 mi away · 1.8 mi, surface unknown
- Yolo Causeway Bicycle Path 3.0 mi away · 1.7 mi, paved
- Garden Highway Bike Trail 3.0 mi away · 1.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- City of West Sacramento - Acquisition of the Clarksburg Branch of the Sierra Railroad Project (SCH 2004052019) — CEQAnet, Governor's Office of Land Use and Climate Innovation · government source · checked Oct 16, 2026 Supports: 2004 acquisition of 10 miles of the Clarksburg line from the Sierra Northern Railway Company, multi-use trail on a 3.25-mile segment, additional one-mile trail easement to the south
- Clarksburg Branch Line Trail Project, Notice of Exemption (February 28, 2025) — CEQAnet, Governor's Office of Land Use and Climate Innovation · government source · checked Oct 16, 2026 Supports: trail name; City of West Sacramento project to pave about 2.2 miles of existing gravel path along the former Clarksburg Branch Line from which rails have been removed; 600-foot segment along South River Road with a grade-separated structure; connection to the newly developed Southport Levee Recreation Trail; Class I trail
- Great Delta Trail — Visit the California Delta · web · checked Oct 16, 2026 Supports: about 4.3 miles from South River Road to the southern city limit; 1.3 miles paved; access to Southport Town Center, River City High School and West Sacramento Recreation Center; West Sacramento segment of the Delta Trail network
- Way: Clarksburg Path — OpenStreetMap · web · checked Oct 16, 2026 Supports: OpenStreetMap name, mapped extent, asphalt surface tags
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.