States › New Hampshire

Derry Rail Trail

Rail-trail in New Hampshire · OpenStreetMap relation

Runs through Derry · Rockingham County

Conditions now

Loading the weather near Derry…

Forecast by the National Weather Service for Derry · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.4 mi 5.4 km1
On former railbed
3.2 mi 95%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Abbott Court Lot mile 2.9 directions to Abbott Court Lot
  2. Merchants Row Lot mile 2.9 directions to Merchants Row Lot
  3. Parking at Abbott Court mile 2.9 directions to trailhead 3
  4. Parking at Sawyer Court mile 2.9 directions to trailhead 4
  5. Parking at West Broadway mile 2.9 directions to trailhead 5
  6. McAllister Court Lot mile 3 directions to McAllister Court Lot
  7. Parking at McAllister Court mile 3 directions to trailhead 7
  8. Parking at Manning Street mile 3 directions to trailhead 8
  9. Parking at Pearl Street mile 3 directions to trailhead 9
  10. Parking at Pearl Street mile 3 directions to trailhead 10
  11. Parking at Courthouse Lane mile 3.1 directions to trailhead 11
  12. Parking at Rollins Street mile 3.2 · water directions to trailhead 12
Derry Rail Trail 1.0, Derry NH.jpg (opens in a new tab)
Derry Rail Trail 1.0, Derry NH.jpg · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Derry Rail Trail is a paved rail trail of about 3.6 miles in Derry, New Hampshire, on the former Manchester and Lawrence branch of the Boston and Maine. It is a section of the Granite State Rail Trail, planned to run 125 miles from Salem to Lebanon, and of a 23-mile route from Salem through Windham, Derry and Londonderry to Manchester. The Derry Rail Trail Alliance, a nonprofit, raises funds and coordinates volunteers to build and maintain the path.

The Manchester and Lawrence Railroad was chartered in 1847 and opened in November 1849 between Manchester and the Massachusetts line; the Boston and Maine gained control in 1887. The section from North Salem to Derry was taken out of service in 1980 and abandoned in 1984, and the line from Derry to Londonderry was abandoned in 1986. Derry built its trail in three segments, the last two completed in 2009 and 2011.

The trail begins at the Windham line just north of Windham Depot, where it continues as the Windham Rail Trail. It runs north through woods and wetlands, crosses Beaver Brook on a stone arch bridge, passes the former Derry Depot on West Broadway and crosses East Broadway in downtown Derry, and ends at Hood Park on Rollins Street, where parking is available; a dirt path continues 0.3 mile along Hoods Pond. About a mile of corridor separates it from the Londonderry Rail Trail. The planned link must cross the new access road for Interstate 93's Exit 4A, where the state dropped a planned tunnel in 2021 in favor of a crosswalk. Advocates sued in 2024, a federal judge barred the change in 2025, and a February 2026 settlement requires the state to build the tunnel; Derry and Londonderry plan to connect their trails once the work is finished, expected in spring 2028.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Manchester - Lawrence and Manchester and Lawrence Branch. From New Hampshire Railroads (NH GRANIT / NHDOT).

Shade

62% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
W Hampstead, 10.9 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343745576876828073614938
Low °F151624344454605851393021
Precipitation, in33.34.24.1443.63.744.93.74.2
Snow, in17.521.914.32.7000000.92.116.1
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Manchester sheet (1:62,500); the 1953 Windham sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9728493, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Manchester and Lawrence Railroad — Wikipedia · organization · checked Oct 13, 2026
    Supports: 1847 charter, November 1849 opening, B&M control 1887, North Salem–Derry out of service 1980 and abandoned 1984, Derry–Londonderry abandoned 1986, Derry trail built in three segments with the last two in 2009 and 2011, tunnel-to-crosswalk change and 2024 lawsuit
  3. History — Derry Rail Trail Alliance · organization · checked Oct 13, 2026
    Supports: former Manchester and Lawrence branch of the Boston and Maine, Derry Depot on West Broadway, connection to the Windham Rail Trail, planned Londonderry connection, the Alliance's role
  4. About the Rail Trail — Londonderry Trailways · organization · checked Oct 13, 2026
    Supports: 23-mile Salem–Manchester route, 125-mile Granite State Rail Trail from Salem to Lebanon, link from the Londonderry trail to the Derry Rail Trail
  5. Advocates for Derry Rail Trail Win Tunnel Case — InDepthNH (February 10, 2026) · organization · checked Oct 13, 2026
    Supports: February 2026 settlement requiring a tunnel under the Exit 4A access road, 2021 removal of the tunnel, 2024 lawsuit, 2025 injunction, completion expected spring 2028, plan to connect the Derry and Londonderry trails
  6. Derry Rail Trail — TrailLink · web · checked Oct 13, 2026
    Supports: 3.6 miles, asphalt, start north of Windham Depot, woods and wetlands, stone arch bridge over Beaver Brook, East Broadway, Hood Park end and parking at 4 Rollins Street, 0.3-mile dirt path along Hoods Pond, Londonderry trail about a mile north

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.