States › New Hampshire

Salem Bike-Ped Corridor

Rail-trail in New Hampshire

Runs through Salem · Rockingham County

Conditions now

Loading the weather near Methuen…

Forecast by the National Weather Service for Methuen · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.8 mi 7.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Via Toscana mile 2.7 directions to trailhead 1
  2. Parking at Via Toscana mile 2.8 directions to trailhead 2
  3. Parking at South Village Drive mile 2.8 directions to trailhead 3
  4. Parking at South Village Drive mile 2.8 directions to trailhead 4
  5. Parking at South Village Drive mile 2.8 directions to trailhead 5
  6. Parking at South Village Drive mile 2.8 directions to trailhead 6
  7. Parking at South Broadway mile 3 directions to trailhead 7
  8. Parking at South Broadway mile 3.1 directions to trailhead 8
  9. Parking at South Broadway mile 3.3 directions to trailhead 9
  10. Parking at South Broadway mile 3.5 directions to trailhead 10
  11. Parking at South Broadway mile 4.3 directions to trailhead 11
  12. Parking at South Broadway mile 4.3 directions to trailhead 12
  13. Parking at South Broadway mile 4.3 directions to trailhead 13
  14. Parking at South Broadway mile 4.3 directions to trailhead 14
  15. Parking at South Broadway mile 4.3 directions to trailhead 15
  16. Parking at Sarl Drive mile 4.3 directions to trailhead 16
  17. Parking at South Broadway mile 4.4 directions to trailhead 17
  18. Parking at Cuomo Way mile 4.4 directions to trailhead 18
  19. Parking at Cuomo Way mile 4.4 directions to trailhead 19
  20. Parking at South Broadway mile 4.5 directions to trailhead 20
  21. Parking at Cuomo Way mile 4.5 directions to trailhead 21
  22. Parking at South Broadway mile 4.6 directions to trailhead 22
  23. Parking at South Broadway mile 4.6 directions to trailhead 23
  24. Parking at South Broadway mile 4.6 directions to trailhead 24
  25. Parking at South Broadway mile 4.6 directions to trailhead 25
  26. Parking at South Broadway mile 4.7 directions to trailhead 26
  27. Parking at South Broadway mile 4.7 directions to trailhead 27
  28. Parking at South Broadway mile 4.8 directions to trailhead 28
  29. Parking at Hillcrest Road mile 4.8 directions to trailhead 29
  30. Parking at South Broadway mile 4.9 directions to trailhead 30
  31. Parking at South Broadway mile 4.9 directions to trailhead 31
  32. Parking at Hampshire Road mile 5 directions to trailhead 32
  33. Parking at South Broadway mile 5 directions to trailhead 33
W, Salem Bike Ped Corridor, Salem NH.jpg (opens in a new tab)
W, Salem Bike Ped Corridor, Salem NH.jpg · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Salem Bike-Ped Corridor is a rail trail in Salem, New Hampshire, on the former Manchester and Lawrence Railroad between the Windham town line and the Massachusetts border at Methuen. The town calls it the Salem Bicycle Pedestrian Corridor (Rail Trail). It is the southern end of a 23-mile route from Salem through Windham, Derry and Londonderry to Manchester, which in turn is to form part of the planned 125-mile Granite State Rail Trail from Salem to Lebanon. A volunteer group, the Friends of the Salem Bike-Ped Corridor, has installed granite benches along the trail.

The Manchester and Lawrence Railroad was chartered in 1847 and opened in November 1849, and the Boston and Maine gained control of it in 1887. Regular passenger service ended in 1953, though summer specials ran to Rockingham Park in Salem until 1960. Freight from Lawrence to North Salem ended in December 1992, service to the Rockingham Park siding ended in March 1999, and all service north of the Lawrence city line ended in June 2001. The northern portions of the Salem trail opened in 2016 and 2018, with the rest of the 5.2-mile corridor planned.

This record maps about 4.8 miles. TrailLink lists the trail at 4.95 miles between North Broadway and Range Street and Hampshire Road, with asphalt, dirt and grass surfaces: it is paved from the northern end south to Main Street, and south of Main Street it is unpaved and better suited to walking and mountain biking. At the north end riders continue into Windham on the Windham Rail Trail. Parking is available at the municipal lot across Main Street from Salem Depot and at trailside parking at the Salem–Windham town line, entered from Route 28.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Manchester and Lawrence Branch. From New Hampshire Railroads (NH GRANIT / NHDOT).

Shade

24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Lawrence Municipal Airport, 10.3 km from the trail's middle, 7 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353845586877838274625140
Low °F192128384857636254433425
Precipitation, in2.92.43.43.63.443.533.84.13.53.3
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Haverhill sheet (1:62,500); the 1955 Ayers Village sheet (1:24,000) shows the area at mid-century. Browse all 21 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Portion of Windham Rail Trail to be Closed April 7 – May 5, 2025 — Town of Salem, NH · government source · checked Oct 13, 2026
    Supports: name Salem Bicycle Pedestrian Corridor (Rail Trail), northbound users continue into Windham on the Windham Rail Trail
  3. Manchester and Lawrence Railroad — Wikipedia · organization · checked Oct 13, 2026
    Supports: 1847 charter, November 1849 opening, B&M control 1887, passenger service end 1953 and Rockingham Park specials to 1960, freight end dates 1992, 1999 and 2001, Salem trail northern portions opened 2016 and 2018, 5.2-mile corridor planned
  4. About the Rail Trail — Londonderry Trailways · organization · checked Oct 13, 2026
    Supports: 23-mile route from Salem through Windham, Derry and Londonderry to Manchester; 125-mile Granite State Rail Trail from Salem to Lebanon
  5. Salem Bike-Ped Corridor — TrailLink · web · checked Oct 13, 2026
    Supports: 4.95 miles, endpoints North Broadway & Range Street and Hampshire Road, asphalt, dirt and grass surfaces, paved to Main Street, unpaved south of Main Street suited to walking and mountain biking
  6. Friends of Salem Bike-Ped Corridor Newsletter — CMA Engineers · web · checked Oct 13, 2026
    Supports: Friends group installed granite benches, parking at the municipal lot across Main Street from Salem Depot and at the Salem–Windham town line off Route 28

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.