Windham Greenway
Rail-trail in New Hampshire
Runs through Windham · Rockingham County
Conditions now
Loading the weather near Londonderry…
Forecast by the National Weather Service for Londonderry · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Nashua Rd Court Parking mile 0.7 directions to Nashua Rd Court Parking
- Nashua Rd Field Parking mile 0.8 directions to Nashua Rd Field Parking
- Parking at North Lowell Road mile 2.6 directions to trailhead 3
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Windham Greenway is an unpaved rail trail of about 2.7 miles in Windham, New Hampshire, on the old railroad alignment that runs southwest from Windham Junction toward Nashua. It is a separate trail from the paved Windham Rail Trail, which uses the Manchester and Lawrence line through Windham Junction. No town or state page describing the greenway, or naming who manages it, was found.
The alignment belonged to the Nashua and Rochester Railroad, formed in 1847 to extend the Worcester and Nashua line from Nashua through Hudson, Windham, Derry, Fremont and Epping to Rochester. The Worcester and Nashua leased it in 1874, the two companies merged as the Worcester, Nashua and Rochester Railroad in 1883, and the Boston and Maine leased the line in 1886, running it as its Worcester, Nashua and Portland Division. In 1932 the Boston and Maine discontinued the section from Hudson to Fremont, which includes Windham.
There is no established route onto the trail from Windham Junction; a gravel road passes under Interstate 93 to reach it. The easiest access is the parking area at Foster's Pond, roughly midway along the route. The surface is compacted gravel and dirt: the northern part is the narrowest, with rocks, bumps and muddy patches in wet months, and the trail is wider but still rocky south of Londonderry Road. Near Kendall Pond Road dense vegetation makes the route nearly impassable, and informal paths lead to roads across unmarked private property. A 2022 description reported plans to pave the trail.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Worcester - Nashua - Rochester and State of New Hampshire - Inactive. From New Hampshire Railroads (NH GRANIT / NHDOT).
- Shade
78% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Hudson 1 SSE, 9.4 km from the trail's middle, 35 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 36 45 58 69 78 83 82 74 61 49 39 Low °F 13 14 23 34 46 56 61 59 51 38 28 20 Precipitation, in 3.3 3.2 4.2 4.1 3.6 4.2 3.3 3.8 3.7 4.7 3.7 4.3 Snow, in 17.1 16.3 14.6 2.8 0 0 0 0 0 0.6 2 13.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1905 Manchester sheet (1:62,500); the 1953 Windham sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Rockingham Recreational Trail Fremont Branch 0.2 mi away · 18.2 mi, crushed stone
- Windham Rail Trail 0.2 mi away · 4.2 mi, paved
- Derry Rail Trail 0.3 mi away · 3.4 mi, paved
- Salem Bike-Ped Corridor 3.6 mi away · 4.8 mi, paved
- Nashua & Lawrence Electric Railroad 3.7 mi away · 1.4 mi, dirt
- Londonderry Rail Trail 4.6 mi away · 4.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Worcester, Nashua and Rochester Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: Nashua and Rochester Railroad formed 1847, route through Hudson, Windham, Derry, Fremont and Epping to Rochester, 1874 lease, 1883 merger, 1886 B&M lease as the Worcester, Nashua and Portland Division, 1932 discontinuance of Hudson–Fremont
- Windham Greenway Rail Trail, NH — Trailspotting · web · checked Oct 13, 2026 Supports: route southwest from Windham Junction toward Nashua, separate from the Windham Rail Trail, about 2.5–2.6 miles, access via gravel road under I-93, Foster's Pond parking, surface and conditions north and south of Londonderry Road, overgrown near Kendall Pond Road with informal paths across private property, plans to pave
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.