States › Michigan

Fieldcrest Pathway

Greenway in Michigan

Runs through Green Oak Township · Livingston County

Conditions now

Loading the weather near Brighton…

Forecast by the National Weather Service for Brighton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.6 mi 4.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Silver Lake Road mile 0 directions to trailhead 1
  2. MDOT Public Car Pool Parking mile 0.1 directions to MDOT Public Car Pool Parking
  3. Parking at Fieldcrest Drive mile 0.1 directions to trailhead 3
  4. Parking at Fieldcrest Drive mile 0.5 directions to trailhead 4
  5. Park and Ride mile 2.6 directions to Park and Ride
Huron River Viewed from Bridge on Fieldcrest Drive, Green Oak Township, Michigan - panoramio (opens in a new tab)
Huron River Viewed from Bridge on Fieldcrest Drive, Green Oak Township, Michigan - panoramio · Photo: Dwight Burdette · CC BY 3.0 · Wikimedia Commons

About this trail

The Fieldcrest Pathway is a paved path along Fieldcrest Drive in Green Oak Township, Livingston County, Michigan. Green Oak Charter Township's existing recreation facilities map labels it the Fieldcrest Trail. OpenStreetMap maps it as an asphalt cycleway, bicycles and pedestrians designated, in three pieces totaling about 2.6 miles (4.1 km), and includes some of its ways in the relation for the Great Lake-to-Lake Trails Route 1, which runs from Port Huron to South Haven.

In August 2025 WHMI reported that the Huron-Clinton Metroparks have been working to connect their parks with state recreation areas, and that a group prepared preliminary plans for five miles (8 km) of pathway. A pathway proposed to run parallel to Maltby Road across the township would ultimately intersect the township's Fieldcrest Trail just south of the Green Oak Village Mall. The township supervisor said he had no idea if, when and how the Fieldcrest south trail would be connected.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Howell Wwtp, 18.8 km from the trail's middle, 6 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313544586979838175624836
Low °F141524344555585749382921
Precipitation, in2.11.622.93.63.733.63.12.92.42
Snow, in10.47.94.10.70000001.28.9
Old maps

USGS topographic maps of the trail's middle go back to the 1902 Dexter sheet (1:62,500); the 1965 Hamburg sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Existing Recreation Facilities map (11-2-2020) — Green Oak Charter Township · web · checked Oct 31, 2026
    Supports: map label FIELDCREST TRAIL in Green Oak Township
  3. Metropark-to-State Park Pathway Connector Project in Green Oak Township — WHMI (August 21, 2025) · web · checked Oct 31, 2026
    Supports: Metroparks working to connect their parks with state recreation areas; a group prepared preliminary plans for five miles of pathway; a pathway proposed parallel to Maltby Road across the township would ultimately intersect the township's Fieldcrest Trail just south of the Green Oak Village Mall; supervisor's remarks on the Fieldcrest south trail connection
  4. Fieldcrest Pathway — OpenStreetMap way 431481566 · web · checked Oct 31, 2026
    Supports: name Fieldcrest Pathway; highway=cycleway, surface=asphalt, bicycle=designated, foot=designated
  5. Fieldcrest Drive — OpenStreetMap way 109655453 · web · checked Oct 31, 2026
    Supports: road named Fieldcrest Drive, highway=tertiary; the mapped path lies within 30 m of this road
  6. The Great Lake-to-Lake Trails — OpenStreetMap relation 7962984 · web · checked Oct 31, 2026
    Supports: route=bicycle relation, ref 1, from Port Huron to South Haven, whose members include Fieldcrest Pathway ways

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.