Fish Creek Trail
Greenway in Alaska · OpenStreetMap relation
Runs through Anchorage · Anchorage Municipality
Conditions now
Loading the weather near Anchorage…
Forecast by the National Weather Service for Anchorage · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Iris Drive mile 0.6 directions to trailhead 1
- Parking at Spenard Road mile 0.7 directions to trailhead 2
- Parking at Spenard Road mile 0.7 directions to trailhead 3
- Parking at Spenard Road mile 0.8 directions to trailhead 4
- Parking at Turnagain Boulevard mile 0.8 directions to trailhead 5
- Parking at Turnagain Boulevard mile 0.9 directions to trailhead 6
- Parking at Turnagain Boulevard mile 1 directions to trailhead 7
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Fish Creek Trail is a paved multi-use trail of about 1.5 miles in Anchorage, Alaska, following Fish Creek through the Spenard area. The Anchorage Park Foundation describes the project as connecting Fish Creek from Midtown's Cuddy Pond to Cook Inlet. OpenStreetMap maps parking along Spenard Road and Iris Drive near the trail.
The trail was rebuilt over three years at a cost of about $5 million, with new pavement and four new bridges. Funding came mostly from an Alaska Transportation Alternatives Program grant, grants from the Anchorage Metropolitan Area Transportation Solutions (AMATS) and a voter-approved bond. A grand reopening with a ribbon-cutting was held on October 31, 2019. Partners included the Alaska Department of Transportation, AMATS, the Alaska Railroad, the Spenard Community Council and Friends of Fish Creek.
A separate project led by the Alaska Department of Transportation and Public Facilities with Anchorage Parks and Recreation would build a new multi-use trail from the Fish Creek Trail at Northern Lights Boulevard to the Coastal Trail. Its environmental document was completed in March 2025, and the project team is moving toward final design. The municipality would own and maintain it.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Anchorage Lake Hood Airport, 1.8 km from the trail's middle, 11 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 23 27 33 46 58 66 68 65 57 42 29 25 Low °F 10 14 17 30 41 50 54 52 43 31 18 13 Precipitation, in 0.6 0.6 0.6 0.4 0.6 0.9 1.8 2.8 3.1 1.7 1.1 0.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1951 Anchorage sheet (1:250,000); the 1953 Anchorage A-8 sheet (1:63,360) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Tony Knowles Coastal Trail 0.9 mi away · 10.4 mi, paved
- A/C St shared use path 1.1 mi away · 6.9 mi, paved
- Chester Creek Trail 1.1 mi away · 4.7 mi, paved
- Campbell Creek Trail 1.8 mi away · 7.6 mi, paved
- Ship Creek Trail 2.6 mi away · 2.6 mi, paved
- Chester Creek Connector 3.7 mi away · 2.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 15669964, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Fish Creek Trail Re-Opening and Trail Trick or Treat - Anchorage Park Foundation · organization · checked Oct 17, 2026 Supports: Cuddy Pond to Cook Inlet, three-year $5 million renovation, new pavement and four bridges, funding, October 31, 2019 reopening, partners
- Fish Creek Trail Connection - fishcreektrail.com · web · checked Oct 17, 2026 Supports: connection project to Coastal Trail led by DOT&PF with Anchorage Parks, environmental document March 2025, final design, municipal ownership
- OpenStreetMap relation 15669964 · web · checked Oct 17, 2026 Supports: mapped parking at Spenard Road and Iris Drive
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.