Groveland Community Trail
Rail-trail in Massachusetts · OpenStreetMap relation
Runs through Groveland · Essex County
Conditions now
Loading the weather near Haverhill…
Forecast by the National Weather Service for Haverhill · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at School Street mile 1.1 directions to trailhead 1
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Groveland Community Trail is a paved multi-use path in Groveland, Essex County, Massachusetts. TrailLink gives its length as 3.25 miles, from Main Street opposite the Town Hall to King Street at the Georgetown town line, including about 1.3 miles of sidewalk; about 1.9 miles are mapped here. Its off-road part follows the National Grid utility corridor on the bed of the former Georgetown Branch railroad. Streetsblog Massachusetts reported that the trail opened in 2023.
A 2012 feasibility study by the Merrimack Valley Planning Commission, prepared for Haverhill, Georgetown and Groveland, traces the branch to the Newburyport and Bradford Railroad, which opened from Newburyport to Georgetown in 1849 and west to the Boston and Maine Railroad at Bradford in 1851. The Boston and Maine had leased the line by 1860 and abandoned the section from Georgetown to a factory in Haverhill in 1942. The corridor through Groveland is now used mainly by National Grid for electric lines, with substations west of Main Street and east of King Street. The study examined a shared-use path from the east end of the Bradford Rail Trail in Haverhill to Moulton Way in Georgetown.
From the Town Hall the route follows the Main Street sidewalk to 441 Main Street, then leaves the road and runs southeast as a 10-foot-wide paved path, crossing Center Street, School Street and Ashcroft Terrace before reaching King Street. Trailheads with parking are at both ends, and dogs must be leashed. TrailLink describes the trail as part of the Merrimack River Trail system and a future link to the Border to Boston Trail.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
46% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Groveland, 1.6 km from the trail's middle, 14 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 35 38 46 58 69 78 83 81 73 62 51 41 Low °F 17 19 26 36 46 56 62 60 52 40 32 23 Precipitation, in 3.7 3.6 5 4.2 3.8 4.2 3.6 3.4 4.1 4.9 3.9 4.7 Snow, in 17.9 17.2 14.4 2.4 0 0 0 0 0 0.4 1.8 13 - Old maps
USGS topographic maps of the trail's middle go back to the 1886 Lawrence sheet (1:62,500); the 1952 South Groveland sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Georgetown-Byfield Rail Trail 1.0 mi away · 2.8 mi, dirt
- Border to Boston Trail 3.8 mi away · 7.0 mi, crushed stone
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 19135696, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Georgetown Branch Shared-use Path Feasibility Study — Merrimack Valley Planning Commission (February 2012) · organization · checked Oct 13, 2026 Supports: railroad history (1849, 1851, lease by 1860, 1942 abandonment); National Grid use of the corridor and Groveland substations; street crossings in Groveland; study limits from the Bradford Rail Trail to Moulton Way
- New Trails We Can Look Forward to in 2025 — Streetsblog Massachusetts · press · checked Oct 13, 2026 Supports: opened in 2023; King Street southern end
- Groveland Community Trail — TrailLink · web · checked Oct 13, 2026 Supports: 3.25 miles, endpoints, 1.3 miles of sidewalk to 441 Main Street, utility right-of-way, crossings, 10-foot paved width, parking, leashed dogs, Merrimack River Trail and Border to Boston links
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.