States › Massachusetts

Groveland Community Trail

Rail-trail in Massachusetts · OpenStreetMap relation

Runs through Groveland · Essex County

Conditions now

Loading the weather near Haverhill…

Forecast by the National Weather Service for Haverhill · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
1.9 mi 3.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at School Street mile 1.1 directions to trailhead 1
Groveland, along the trail (opens in a new tab)
Groveland, along the trail · Photo: en:User:LymanSchool (Richard B. Johnson) · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Groveland Community Trail is a paved multi-use path in Groveland, Essex County, Massachusetts. TrailLink gives its length as 3.25 miles, from Main Street opposite the Town Hall to King Street at the Georgetown town line, including about 1.3 miles of sidewalk; about 1.9 miles are mapped here. Its off-road part follows the National Grid utility corridor on the bed of the former Georgetown Branch railroad. Streetsblog Massachusetts reported that the trail opened in 2023.

A 2012 feasibility study by the Merrimack Valley Planning Commission, prepared for Haverhill, Georgetown and Groveland, traces the branch to the Newburyport and Bradford Railroad, which opened from Newburyport to Georgetown in 1849 and west to the Boston and Maine Railroad at Bradford in 1851. The Boston and Maine had leased the line by 1860 and abandoned the section from Georgetown to a factory in Haverhill in 1942. The corridor through Groveland is now used mainly by National Grid for electric lines, with substations west of Main Street and east of King Street. The study examined a shared-use path from the east end of the Bradford Rail Trail in Haverhill to Moulton Way in Georgetown.

From the Town Hall the route follows the Main Street sidewalk to 441 Main Street, then leaves the road and runs southeast as a 10-foot-wide paved path, crossing Center Street, School Street and Ashcroft Terrace before reaching King Street. Trailheads with parking are at both ends, and dogs must be leashed. TrailLink describes the trail as part of the Merrimack River Trail system and a future link to the Border to Boston Trail.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

46% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Groveland, 1.6 km from the trail's middle, 14 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353846586978838173625141
Low °F171926364656626052403223
Precipitation, in3.73.654.23.84.23.63.44.14.93.94.7
Snow, in17.917.214.42.4000000.41.813
Old maps

USGS topographic maps of the trail's middle go back to the 1886 Lawrence sheet (1:62,500); the 1952 South Groveland sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 19135696, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Official trail website · Official site · checked Oct 31, 2026
  3. Georgetown Branch Shared-use Path Feasibility Study — Merrimack Valley Planning Commission (February 2012) · organization · checked Oct 13, 2026
    Supports: railroad history (1849, 1851, lease by 1860, 1942 abandonment); National Grid use of the corridor and Groveland substations; street crossings in Groveland; study limits from the Bradford Rail Trail to Moulton Way
  4. New Trails We Can Look Forward to in 2025 — Streetsblog Massachusetts · press · checked Oct 13, 2026
    Supports: opened in 2023; King Street southern end
  5. Groveland Community Trail — TrailLink · web · checked Oct 13, 2026
    Supports: 3.25 miles, endpoints, 1.3 miles of sidewalk to 441 Main Street, utility right-of-way, crossings, 10-foot paved width, parking, leashed dogs, Merrimack River Trail and Border to Boston links

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.