Morgan Creek Trail
Greenway in Iowa · OpenStreetMap relation
Runs through Cedar Rapids · Linn County
Conditions now
Loading the weather near Cedar Rapids…
Forecast by the National Weather Service for Cedar Rapids · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Preserve Lane mile 0.1 directions to trailhead 1
- Parking at Preserve Lane mile 0.2 directions to trailhead 2
- Parking at Worcester Road mile 4.8 directions to trailhead 3
- Parking mile 5.5 directions to trailhead 4
- Parking at E Avenue Northwest mile 5.6 directions to trailhead 5
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Morgan Creek Trail is a trail in Linn County, Iowa, in and around Cedar Rapids, built in pieces that are planned to meet at the Cedar River. The Linn County Trails Association describes it in two parts: 2.9 miles from the entrance to Morgan Creek Park on E Avenue NW to Covington Road, and, east of the Cedar River, 1 mile from 42nd Street to the river. At the park entrance it connects with the Cherokee Trail. It is a greenway, not a rail-trail.
The western part runs through Morgan Creek Park, whose amenities include a playground, an off-leash dog area and grass hiking trails, and then follows a separated path beside farmland. The gap between the two parts is still being closed. In August 2025 the association reported that work had resumed on Phase 1, the east-side section from 42nd Street past Xavier High School, that a bridge over the railroad was underway, and that planning money was being sought for the Beichler Bridge, which would cross the Cedar River on existing piers. In June 2026 it reported that Phase 4, a 1.7-mile segment from the Covington Road underpass to the west bank of the river, was in final design along the Highway 100 right-of-way, with plans going to the Iowa Department of Transportation for bidding and construction expected in 2027.
This record covers both parts as OpenStreetMap maps them, about 3.9 miles. OpenStreetMap maps asphalt on parts of the route and parking near Worcester Road on the western part and near Preserve Lane on the eastern part.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Former Chicago, Milwaukee, St. Paul & Pacific / Chicago, Milwaukee & St. Paul line, built 1882–1907, abandoned 1907–1980 in sections. From Iowa DOT Rail Line Abandoned (CC BY 4.0).
- Shade
8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Cedar Rapids #1, 15.6 km from the trail's middle, 16 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 35 49 63 74 82 86 83 77 64 48 35 Low °F 12 17 28 38 50 60 63 61 53 42 29 19 Precipitation, in 1.2 1.3 2.1 4 4.7 5.7 4.5 4.4 4 3 2.2 1.7 Snow, in 8.7 8.3 4 1.5 0 0 0 0 0 0.6 2.2 9 - Old maps
USGS topographic maps of the trail's middle go back to the 1888 Shellsburg sheet (1:62,500); the 1968 Shellsburg sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationLinn County Trails Association: Morgan Creek
Nearby trails
- Cherokee Trail within 0.2 mi · 2.2 mi, surface unknown
- Edgewood Trail 1.2 mi away · 4.1 mi, paved
- Ellis Trail 1.5 mi away · 2.7 mi, paved
- Cedar Valley Nature Trail 2.7 mi away · 50.7 mi, paved
- Cedar River Trail 3.3 mi away · 4.8 mi, paved
- Grant Wood Trail 3.5 mi away · 17.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14497874, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Morgan Creek — Linn County Trails Association · organization · checked Oct 15, 2026 Supports: 2.9 miles from the Morgan Creek Park entrance on E Ave NW to Covington Road, 1 mile east of the Cedar River from 42nd Street, Cherokee Trail connection, route through the park and beside farmland, park amenities
- August 2025 E-News — Linn County Trails Association · organization · checked Oct 15, 2026 Supports: work resumed on east-side Phase 1 from 42nd Street past Xavier High School, railroad bridge underway, planning funds sought for the Beichler Bridge on existing piers
- June 2026 Trail News — Linn County Trails Association · organization · checked Oct 15, 2026 Supports: Phase 4 from the Covington Road underpass to the west side of the Cedar River, Highway 100 right-of-way, 1.7 miles, plans to IDOT for bidding, construction in 2027
- Morgan Creek Trail, relation 14497874 — OpenStreetMap · web · checked Oct 15, 2026 Supports: two mapped parts in Cedar Rapids and near Covington, asphalt sections, parking near Worcester Road and Preserve Lane
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.