States › Iowa

Edgewood Trail

Greenway in Iowa · OpenStreetMap relation

Runs through Cedar Rapids · Linn County

Conditions now

Loading the weather near Cedar Rapids…

Forecast by the National Weather Service for Cedar Rapids · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
4.1 mi 6.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Town Center Way Northeast mile 0 directions to trailhead 1
  2. Parking at Blairs Ferry Road Northeast mile 0 directions to trailhead 2
  3. Parking at Town Center Way Northeast mile 0 directions to trailhead 3
  4. Parking at Fountains Drive Northeast mile 0.1 directions to trailhead 4
  5. Parking at Fountains Drive Northeast mile 0.1 directions to trailhead 5
  6. Parking at Cross Pointe Boulevard Northeast mile 0.2 directions to trailhead 6
  7. Parking at Glass Road Northeast mile 1.1 directions to trailhead 7
  8. Parking at Glass Road Northeast mile 1.2 directions to trailhead 8
  9. Parking at Edgewood Road Northeast mile 1.2 directions to trailhead 9
  10. Parking at Edgewood Road Northeast mile 1.3 directions to trailhead 10
  11. Parking at Edgewood Road Northeast mile 1.3 directions to trailhead 11
  12. Parking at Edgewood Road Northwest mile 2.1 directions to trailhead 12
  13. Parking at Edgewood Road Northwest mile 2.2 directions to trailhead 13
  14. Parking at 26th Street Northwest mile 2.3 directions to trailhead 14
  15. Parking at River Bluff Drive Northwest mile 2.4 directions to trailhead 15
  16. Parking at Zika Avenue Northwest mile 2.4 directions to trailhead 16
  17. Parking at 29th Street Northwest mile 2.5 directions to trailhead 17
  18. Parking at 29th Street Northwest mile 2.6 directions to trailhead 18
  19. Parking at 29th Street Northwest mile 2.6 directions to trailhead 19
  20. Parking at 29th Street Northwest mile 2.6 directions to trailhead 20
  21. Parking at 29th Street Northwest mile 2.6 directions to trailhead 21
  22. Parking at Queen Drive Southwest mile 6.4 directions to trailhead 22
  23. Parking at Edgewood Road Southwest mile 6.5 directions to trailhead 23
  24. Parking at 37th Avenue Southwest mile 6.5 directions to trailhead 24
  25. Parking at Queen Court Southwest mile 6.6 directions to trailhead 25
  26. Parking at Queen Court Southwest mile 6.6 directions to trailhead 26
  27. Parking at Queen Court Southwest mile 6.6 directions to trailhead 27
  28. Parking at 37th Avenue Southwest mile 6.6 directions to trailhead 28
  29. Parking at 37th Avenue Southwest mile 6.6 directions to trailhead 29
  30. Parking at 37th Avenue Southwest mile 6.6 directions to trailhead 30
Edgewood Trail drawn on the 1967 USGS topographic map of Cedar Rapids South, Iowa
Then: the 1967 USGS Cedar Rapids South sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Edgewood Trail is a paved path beside Edgewood Road on the west side of Cedar Rapids, Iowa. The Linn County Trails Association describes its main section, the Edgewood Road Trail, as 2 miles of hard-surfaced trail separated from and parallel to Edgewood Road, from Glass Road NE to O Avenue NW, and calls it an important connecting trail for northwest Cedar Rapids, with views of the Cedar River, a crossing of the river and a connection with Ellis Park.

The route mapped on this page is made up of separate, unconnected pieces along Edgewood Road totaling about 4.1 miles, reaching from near 37th Avenue SW in the south to Blairs Ferry Road NE and Town Center Way NE in the north. Sights along the main section include the Cedar Rapids School District headquarters, and the trail links with the Ellis Trail.

The Cedar River crossing was rebuilt in 2024. The City of Cedar Rapids scheduled Edgewood Road Trail Phase 2B to begin on March 4, 2024, modifying the Edgewood Road bridge between Ellis Road NW and Glass Road NE to carry an 8-foot-wide trail and adding about 400 feet of trail north of the bridge, with lane reductions through mid-September. The trails association expects the trail to continue north from Glass Road NE to Blairs Ferry Road NE by 2027, switching to the west side of Edgewood Road at Glass Road; its May 2026 trail news said the segment from Glass Road to 42nd Street would be bid that fall, with construction to start in 2027.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

9% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Cedar Rapids Municipal Airport, 11.8 km from the trail's middle, 8 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F283346607180838175624633
Low °F111627385060636052402817
Precipitation, in0.91.223.64.25.64.44.13.42.921.6
Old maps

USGS topographic maps of the trail's middle go back to the 1887 Cedar Rapids sheet (1:62,500); the 1967 Cedar Rapids South sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 10334951, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Official trail website · Official site · checked Oct 31, 2026
  3. Edgewood Road Bridge and Trail Improvements — City of Cedar Rapids (February 29, 2024) · organization · checked Oct 15, 2026
    Supports: Edgewood Road Trail Phase 2B starting March 4, 2024; bridge between Ellis Road NW and Glass Road NE modified for an eight-foot-wide trail; about 400 feet of trail north of the bridge; traffic control through mid-September 2024
  4. Edgewood Road — Linn County Trails Association · organization · checked Oct 15, 2026
    Supports: pavement; 2 miles hard-surfaced separated trail parallel to Edgewood Road from Glass Road NE to O Ave NW; important northwest Cedar Rapids connecting trail; Cedar River views and crossing; school district headquarters; connection with Ellis Park; similar trails Ellis and Cherokee; extension north from Glass Road NE to Blairs Ferry Road NE by 2027, switching to the west side at Glass Road
  5. May 2026 Trail News — Linn County Trails Association · organization · checked Oct 15, 2026
    Supports: Edgewood Trail from Glass Road to 42nd Street to be bid in fall 2026, construction to start in 2027
  6. Edgewood Trail (relation 10334953) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: mapped pieces along Edgewood Road noted as a disconnected trail; extent from near 37th Avenue SW to Blairs Ferry Road NE and Town Center Way NE

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.