States › Illinois

North Shore Channel Trail

Greenway in Illinois · OpenStreetMap relation

Runs through Evanston, Skokie, Lincolnwood and Chicago · Cook County

Conditions now

Loading the weather near Skokie…

Forecast by the National Weather Service for Skokie · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
11.5 mi 18.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at North Lincoln Avenue mile 1.6 directions to trailhead 1
  2. Parking at North Kedzie Avenue mile 2 directions to trailhead 2
  3. Parking at West Devon Avenue mile 2.1 directions to trailhead 3
  4. Parking at West Pratt Avenue mile 2.6 directions to trailhead 4
  5. Parking at North McCormick Boulevard mile 2.7 directions to trailhead 5
  6. Parking at North McCormick Boulevard mile 2.8 directions to trailhead 6
  7. Parking at North McCormick Boulevard mile 2.9 directions to trailhead 7
  8. Parking at North McCormick Boulevard mile 2.9 directions to trailhead 8
  9. Parking at North McCormick Boulevard mile 3 directions to trailhead 9
  10. Parking at West Touhy Avenue mile 3.1 directions to trailhead 10
  11. Parking Lot D mile 3.4 · restrooms directions to Parking Lot D
  12. Parking at North McCormick Boulevard mile 3.6 · restrooms directions to trailhead 12
  13. Parking at North McCormick Boulevard mile 3.7 · restrooms directions to trailhead 13
  14. Parking at Oakton Street mile 4.2 · restrooms directions to trailhead 14
  15. Parking Lot C mile 5 · restrooms directions to Parking Lot C
  16. Parking Lot B mile 5.3 directions to Parking Lot B
  17. Parking Lot A mile 6 · restrooms directions to Parking Lot A
  18. Parking at McCormick Boulevard mile 6.5 directions to trailhead 18
  19. Parking at Bridge Street mile 6.6 directions to trailhead 19
  20. Parking at Ashland Avenue mile 7 directions to trailhead 20
North Shore Channel Trail 1 (March 2024).jpg (opens in a new tab)
North Shore Channel Trail 1 (March 2024).jpg · Photo: AlphaBeta135 · CC BY 4.0 · Wikimedia Commons

About this trail

The North Shore Channel Trail is a paved multi-use trail of about 8 miles along the North Shore Channel in Chicago, Lincolnwood, Skokie and Evanston, Illinois. It is a canal greenway, not a rail-trail. The channel itself is a 7.7-mile drainage canal built between 1907 and 1910 to carry Lake Michigan water from Wilmette into the North Branch of the Chicago River; the Metropolitan Water Reclamation District of Greater Chicago owns and maintains it. The trail has no single manager in the sources found: its segments pass through city and village parks, including Evanston's Ladd Arboretum.

The trail runs from Lawrence Avenue at Francisco Avenue in Chicago's Lincoln Square north to Green Bay Road at McCormick Boulevard in Evanston, with paths on both sides of the channel for much of the way. The Chicago Department of Transportation's Lincoln Village Pedestrian Bicycle Bridge, a 16-foot-wide, 180-foot-long span just north of Lincoln Avenue, joins the two main sections; it was planned in 2016 to replace a detour on busy Lincoln Avenue and was among the improvements completed in 2019, creating a continuous route from Devon Avenue to Argyle Avenue without street crossings. South of Devon the trail passes under cross streets except Argyle; farther north, crossings are at grade. In Skokie it runs past the Skokie Northshore Sculpture Park, a 2-mile strip of walkways with more than 60 sculptures on the east side of McCormick Boulevard between Dempster Street and Touhy Avenue.

The last 1.5 miles of the channel, from Green Bay Road to Sheridan Road near the Bahá'í House of Worship in Wilmette, has no trail. A feasibility study reported in July 2025 found a path there possible but costly, with $2 to $3 million needed for the first phase of engineering alone, and noted objections from the water district and the Canal Shores golf course; the Wilmette Park District had no action planned.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Chicago Botanic Garden, 14.3 km from the trail's middle, 12 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323646576878848275634938
Low °F161928384857636255433222
Precipitation, in2.122.344.84.33.74.23.63.62.62.3
Snow, in11.37.75.61.1000000.11.95.9
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1899 Evanston sheet (1:62,500); the 1953 Evanston sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in April 2024 said the trail was fine at night with strong lights; opinions on lighting differed, and they flagged blind underpass turns, buckled pavement, rabbits and fallen branches. r/chibike, Apr 2024
  • Riders in early February 2025 reported black ice and little salt on Chicago stretches, with Skokie, Lincolnwood and Evanston sections clearer; one rider in 2026 called it one of few trails cleared in winter. r/chibike, Feb 2025 · r/chibike, Feb 2025 · r/chibike, May 2026
  • Riders in September 2025 described rough pavement in the Chicago stretch, including a raised lip near Peterson that was patched that month, and smoother surface but button-activated crossings farther north. r/chibike, Sep 2025
  • Riders in 2025 and 2026 said no continuous path links Lawrence and Montrose, so they used Manor Avenue to Horner Park and the river path to Belmont, crossing Montrose with care. r/chibike, Jul 2025 · r/chibike, Apr 2026
48 Reddit threads about this trail, Jan 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 93624, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. North Shore Channel — Wikipedia · organization · checked Oct 15, 2026
    Supports: 7.7-mile canal built 1907–1910 from Lake Michigan at Wilmette to the North Branch of the Chicago River; MWRD as navigation authority; trail from Lincoln Square near Lawrence and Francisco to Green Bay Road in Evanston; Lincoln Village Pedestrian Bicycle Bridge completed 2019; Skokie Northshore Sculpture Park and Ladd Arboretum along the trail
  3. North Shore Channel Trail extension possible, but very costly — The Record North Shore (July 24, 2025) · organization · checked Oct 15, 2026
    Supports: 1.5-mile gap from Green Bay Road and McCormick Boulevard to Sheridan Road near the Bahá'í Temple; channel owned and maintained by the water district; first phase of engineering $2–3 million; MWRD concerns and golf course opposition; Wilmette Park District had no action planned
  4. Skokie Northshore Sculpture Park · organization · checked Oct 15, 2026
    Supports: two-mile walkways on the east side of McCormick Boulevard between Dempster Street and Touhy Avenue; over 60 sculptures; bicycling welcome
  5. A Bike-Friendly Bridge Over North Shore Channel Trail Finally Is Happening — DNAinfo Chicago (Sept. 22, 2016) · web · checked Oct 15, 2026
    Supports: trail on both sides of the channel joined via a makeshift connection on Lincoln Avenue; CDOT's Lincoln Village Pedestrian Bicycle Bridge, 16 feet wide and 180 feet long
  6. North Shore Channel Trail | Illinois Trails | TrailLink · web · checked Oct 15, 2026
    Supports: 8.3 miles from Green Bay Road and McCormick Boulevard in Evanston to Lawrence and Francisco avenues in Chicago; paved; trail on both sides of the channel; Lincoln Village Bridge just north of Lincoln Avenue giving a continuous route from Devon to Argyle; crossings under streets south of Devon except Argyle, at grade farther north

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.