Valley Line Trail
Rail-trail in Illinois · OpenStreetMap relation
Runs through Skokie, Lincolnwood and Chicago · Cook County
Conditions now
Loading the weather near Skokie…
Forecast by the National Weather Service for Skokie · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Skokie Valley Trail is a rail-trail that is a total of 25-mile-long (40 km). It's a partial shared-use path for walking, jogging, skateboarding, and cycling.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Terminal Avenue mile 0.5 directions to trailhead 1
- Parking at Taxi Lane mile 1.6 directions to trailhead 2
- Parking at Taxi Lane mile 1.6 directions to trailhead 3
- Parking at Taxi Lane mile 1.6 directions to trailhead 4
- Parking at Carol Street mile 1.6 directions to trailhead 5
- Parking at Niles Center Road mile 2.1 directions to trailhead 6
- Parking at Searle Parkway mile 2.3 directions to trailhead 7
- Parking at Searle Parkway mile 2.3 directions to trailhead 8
- Parking at Oakton Street mile 2.6 · water directions to trailhead 9
- Parking at La Crosse Avenue mile 2.6 · water directions to trailhead 10
- Parking at Oakton Street mile 2.6 · water directions to trailhead 11
- Parking at Oakton Street mile 2.6 · water directions to trailhead 12
- Parking at Terminal Avenue mile 2.9 directions to trailhead 13
- Parking at Brummel Street mile 3.1 directions to trailhead 14
- Parking at Keating Avenue mile 3.1 directions to trailhead 15
- Parking at Lincoln Avenue mile 3.5 directions to trailhead 16
- Parking at West Peterson Avenue mile 5.3 directions to trailhead 17
- Parking at North Kildare Avenue mile 5.8 directions to trailhead 18
(opens in a new tab) About this trail
The Valley Line Trail is a paved multiuse path running about 4.5 miles from the Sauganash neighborhood on Chicago's Northwest Side through Lincolnwood to Skokie, Illinois. The path uses the former Chicago and North Western Railway right-of-way, later Union Pacific, from Bryn Mawr Avenue in Chicago north to Dempster Street in Skokie. Union Pacific filed in May 2002 to abandon the last operating part of the line south of Dempster. Wikipedia treats the path as the southern section of the Skokie Valley Trail, and the Skokie Park District uses that name for the Skokie part.
Chicago, Lincolnwood and Skokie each built their own sections. Chicago's mile, known as the Sauganash Trail, opened in summer 2008 between Bryn Mawr Avenue and Devon Avenue, the city's northern border. In Skokie, the stretch from Dempster Street, beside the CTA Yellow Line station, to Oakton Street was built with the Oakton 'L' stop that opened in spring 2012. The stretch from Oakton to the Lincolnwood border at Lincoln and Jarvis avenues followed in summer 2015. Lincolnwood built the last gap, from Devon to Lincoln and Jarvis, between July and October 2016. That segment cost about $1 million, 80 percent of it federal money, and runs beside a ComEd right-of-way. The ribbon was cut on October 17, 2016. A bridge carrying the trail over Touhy Avenue opened in October 2018.
In December 2018 the Skokie Park District installed an outdoor exercise station beside the trail on Terminal Avenue between Conrad and Greenleaf streets, south of the Dempster Street station. Skokie has planned to extend the trail north from Dempster to the Old Orchard area. A finished piece between Golf Road and Old Orchard Road appears here as a separate segment. North of Dempster, Union Pacific still controls about 8 miles of discontinued corridor to Lake Cook Road, which separates this trail from the Skokie Valley Trail's northern section in Lake County.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Chicago Botanic Garden, 14 km from the trail's middle, 6 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 36 46 57 68 78 84 82 75 63 49 38 Low °F 16 19 28 38 48 57 63 62 55 43 32 22 Precipitation, in 2.1 2 2.3 4 4.8 4.3 3.7 4.2 3.6 3.6 2.6 2.3 Snow, in 11.3 7.7 5.6 1.1 0 0 0 0 0 0.1 1.9 5.9 - On the National Register
- Dempster Street Station, Skokie · building, listed 1996 · nomination file for Dempster Street Station
- Sauganash Historic District, Chicago · historic district, listed 2010 · nomination file for Sauganash Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1899 Evanston sheet (1:62,500); the 1953 Evanston sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
What riders say on Reddit
- Riders in 2024 said drivers on Pratt and Devon often did not stop for the flashing crosswalks; they advised waiting for traffic in every lane to stop, though one local said most drivers at Pratt yielded. r/chibike, Jun 2024 · r/chibike, Jun 2024
- Riders in January 2024, November 2024 and December 2025 said the trail was plowed or mostly clear after snow, with road crossings and bridges the rougher spots. r/chibike, Jan 2024 · r/chibike, Nov 2024 · r/chibike, Dec 2025 · r/chibike, Dec 2025
- Riders in 2024 and 2026 described reaching the North Shore Channel Trail and Lakefront Trail from the trail's south end along Bryn Mawr Avenue, which one called the commute's weak point. r/chibike, Sep 2024 · r/chibike, Feb 2026
- Riders in 2024 and 2025 named Sketchbook Brewing, near the north end beside the Yellow Line, as a ride destination, and one also suggested a bagel shop near Kostner. r/chibike, Sep 2024 · r/chicago, Oct 2024 · r/chibike, Jan 2025
14 Reddit threads about this trail, Jan 2024 to Feb 2026
- How Are The Bike Lanes In Skokie and Evanston? r/chibike · Jun 2024 · 21 comments
- Driver did the right thing and paid the price r/chibike · Jun 2024 · 22 comments
- Status report on trails? r/chibike · Dec 2025 · 8 comments
- 1/22 Bike lane condition report r/chibike · Jan 2024 · 7 comments
- I was surprised to see a City Of Chicago snow plow clearing the Major Taylor Trail early this morning on my way to work. I wonder if the trails are priority after it snows. Could it be a weekend standard with barely anyone being out, they can get more done? r/chibike · Dec 2025 · 7 comments
- Favorite Bike Destinations within/near the city! r/chibike · Sep 2024 · 26 comments
- Is it feasible? E-bike r/chibike · Feb 2026 · 22 comments
- Be Safe Today Y'all r/chibike · Nov 2024 · 28 comments
- Reverse Commute From City to Skokie 3x/week. Is This Tolerable Without a Car? r/AskChicago · Jan 2026 · 63 comments
- Bike Repair/Tool Stand Locations r/chibike · Sep 2025 · 15 comments
- Bike tourist from Michigan wants to get to know Chicago for aprox. 4 days, on a bike r/chibike · Jan 2025 · 22 comments
- I’ve been tasked with exploring a new neighborhood, where should I go? r/chicago · Oct 2024 · 242 comments
- What are some truly HIDDEN gems in Chicago, that most people would never realize exists? r/AskChicago · Sep 2024 · 342 comments
- Bike share availability on the North Branch Trail? r/chibike · Aug 2024 · 6 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Nearby trails
- Old Orchard Road Multi-Use Path within 0.2 mi · 1.2 mi, paved
- North Branch Red Trail 0.4 mi away · 15.7 mi, paved
- Union Pacific Trail 0.6 mi away · 1.1 mi, paved
- North Shore Channel Trail 1.4 mi away · 11.5 mi, paved
- Milwaukee Avenue Bikeway 2.1 mi away · 6.8 mi, paved
- 312 RiverRun 2.6 mi away · 1.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 17251, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Skokie Valley Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q85812700, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- District installs new outdoor fitness station on Skokie Valley Trail — Skokie Park District · organization · checked Oct 15, 2026 Supports: Skokie Valley Trail name in Skokie; exercise station on Terminal Avenue between Conrad and Greenleaf, December 2018; Oakton–Dempster section completed 2012; Touhy Avenue bridge opened October 2018; planned extension north from Dempster to Old Orchard
- Skokie Valley Trail — Wikipedia · organization · checked Oct 15, 2026 Supports: southern section on the former Chicago and North Western (Union Pacific) right-of-way from Bryn Mawr to Dempster; May 2002 abandonment petition; Golf Road–Old Orchard Road piece; about 8 miles of Union Pacific corridor under discontinuance between Dempster and Lake Cook Road
- Lincolnwood Builds New Segments of the Valley Line Trail and the Weber Spur — Streetsblog Chicago · press · checked Oct 15, 2026 Supports: 4.5-mile corridor Sauganash to Skokie; former Union Pacific spur; Sauganash Trail 2008 Bryn Mawr–Devon; Skokie phases 2012 and 2015; Lincolnwood segment July–October 2016, about $1 million, 80% CMAQ, beside ComEd right-of-way; October 17 ribbon cutting; planned Touhy overpass
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
