Union Pacific Trail
Rail-trail in Illinois · OpenStreetMap relation
Runs through Lincolnwood · Cook County
Conditions now
Loading the weather near Lincolnwood…
Forecast by the National Weather Service for Lincolnwood · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West Touhy Avenue mile 0 directions to trailhead 1
- Parking at West Touhy Avenue mile 0 directions to trailhead 2
- Parking at Saint Louis Avenue mile 0 directions to trailhead 3
- Parking at West Touhy Avenue mile 0.1 directions to trailhead 4
- Public Parking mile 0.2 directions to Public Parking
- Parking at Lunt Avenue mile 0.3 directions to trailhead 6
- Parking at Morse Avenue mile 0.4 directions to trailhead 7
- Parking at West Albion Avenue mile 0.8 directions to trailhead 8
- Parking at West Proesel Avenue mile 0.9 directions to trailhead 9
- Parking at Hamlin Avenue mile 0.9 directions to trailhead 10
- Parking at Lincoln Avenue mile 0.9 directions to trailhead 11
- Parking at Hamlin Avenue mile 0.9 directions to trailhead 12
- Parking at West Proesel Avenue mile 1 directions to trailhead 13
- Parking at West Proesel Avenue mile 1.1 directions to trailhead 14
- Parking at West Proesel Avenue mile 1.1 directions to trailhead 15
- Parking at West Proesel Avenue mile 1.1 directions to trailhead 16
(opens in a new tab) About this trail
The Union Pacific Trail is a multiuse path of about one mile on the east side of Lincolnwood, Illinois, built along the former Union Pacific Weber Spur between Devon Avenue, the Chicago city limit, and Touhy Avenue. Streetsblog Chicago calls it the Weber Spur Trail. The Village of Lincolnwood built it: construction began in August 2016 and was finished that December, at a cost of $955,000, 80 percent paid by federal Congestion Mitigation and Air Quality money and 20 percent by the village.
The path runs past the Lincolnwood Town Center mall, a few blocks west of the North Shore Channel Trail. It has five road crossings, at Devon, Lincoln, Pratt, Central Park and Touhy avenues; Lincoln Avenue (US 41) and Touhy are the busiest, and Lincoln and Pratt have push-button flashing lights. At the north end a traffic signal at St. Louis Avenue leads into the Lincolnwood Business Park. In 2017 there was no signal or crosswalk at the Devon Avenue end.
South of Devon the Weber Spur corridor continues into Chicago, where the city plans a trail of about 1.7 miles. As of February 2026 that project had no construction date: Union Pacific still controlled the former right-of-way, the Chicago Department of Transportation was finishing a Phase I engineering and environmental study, and $850,000 in federal fiscal 2026 funding had been awarded, likely for studies and early engineering.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 100% of this route as an abandoned line with the track removed.
- Shade
6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Chicago Botanic Garden, 16 km from the trail's middle, 9 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 36 46 57 68 78 84 82 75 63 49 38 Low °F 16 19 28 38 48 57 63 62 55 43 32 22 Precipitation, in 2.1 2 2.3 4 4.8 4.3 3.7 4.2 3.6 3.6 2.6 2.3 Snow, in 11.3 7.7 5.6 1.1 0 0 0 0 0 0.1 1.9 5.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1899 Evanston sheet (1:62,500); the 1953 Evanston sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- North Shore Channel Trail 0.3 mi away · 11.5 mi, paved
- Valley Line Trail 0.6 mi away · 4.7 mi, paved
- North Branch Red Trail 1.5 mi away · 15.7 mi, paved
- Clark Street Bikeway 2.6 mi away · 1.5 mi, paved
- 312 RiverRun 2.9 mi away · 1.3 mi, paved
- Evanston Lakefront Trail 2.9 mi away · 2.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 10183915, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Eyes on the Street: Checking out the new Weber Spur Trail in Lincolnwood — Streetsblog Chicago · press · checked Oct 15, 2026 Supports: one mile from Devon (Chicago border) to Touhy; Weber Spur Trail name; construction August–December 2016; $955,000, 80% CMAQ, 20% village; passes Lincolnwood Town Center a few blocks west of the North Shore Channel Trail; five crossings; flashing lights at Lincoln and Pratt; signal at St. Louis Avenue into the business park; no signal or crosswalk at Devon
- Lincolnwood Builds New Segments of the Valley Line Trail and the Weber Spur — Streetsblog Chicago · press · checked Oct 15, 2026 Supports: built along the former Union Pacific Weber Spur between Devon and Touhy; federal CMAQ funding with a village match
- Northwest Side trail dream scores $850K, still stuck at the starting line — Hoodline (February 17, 2026) · web · checked Oct 15, 2026 Supports: 1.7-mile Chicago segment; no construction date; Union Pacific still controls the right of way; CDOT Phase I study; $850,000 FY2026 federal funding likely for studies and early engineering; one-mile Lincolnwood stretch completed
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.