PATH Parkway
Greenway in Georgia
Runs through Atlanta · Fulton County
Conditions now
Loading the weather near Atlanta…
Forecast by the National Weather Service for Atlanta · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Marietta Street Northwest mile 0.1 directions to trailhead 1
- Parking at Mc Lendon Street Northwest mile 0.2 directions to trailhead 2
- Parking at 3rd Street Northwest mile 0.2 directions to trailhead 3
- Parking at Marietta Street Northwest mile 0.2 directions to trailhead 4
- Parking at Tech Parkway Northwest mile 0.2 directions to trailhead 5
- Parking at Marietta Street Northwest mile 0.3 directions to trailhead 6
- Parking at Marietta Street Northwest mile 0.4 directions to trailhead 7
- Parking at Means Street Northwest mile 0.4 directions to trailhead 8
- Student Center Parking Deck mile 0.5 directions to Student Center Parking Deck
- Parking at Wallace Street Northwest mile 0.5 directions to trailhead 10
- Parking at Wallace Street Northwest mile 0.5 directions to trailhead 11
- Parking at Ferst Drive Northwest mile 0.7 directions to trailhead 12
- Hampton Inn Car Park (Valet) mile 0.8 directions to Hampton Inn Car Park (Valet)
- Parking at Ferst Drive Northwest mile 0.8 directions to trailhead 14
- Parking at Cherry Street Northwest mile 0.8 directions to trailhead 15
- Parking at Marietta Street Northwest mile 1.4 directions to trailhead 16
- Parking at Marietta Street Northwest mile 1.5 directions to trailhead 17
Plan your visit
- By trainAmtrak: Atlanta, GA (ATL) 1.7 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
PATH Parkway is a bike and pedestrian route of about 1.5 miles along the western edge of the Georgia Tech campus in Atlanta, Georgia. It connects the western edge of Midtown to Downtown Atlanta, and passes the Coca-Cola office complex.
Georgia Tech and the PATH Foundation jointly funded the project; the City of Atlanta announced its grand opening and lists the Coca-Cola Company and Turner among the partners. Construction began in 2016, the path opened in fall 2017, and the ribbon-cutting was held December 5, 2017. The route separates riders and walkers from vehicle traffic, and the city installed four bike share stations along it. People for Bikes ranked it first on its 2017 list of the 10 best new bikeways in America.
The record here covers about 1.7 miles of mapped paths, as drawn in OpenStreetMap.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Atlanta Peachtree Airport, 14.6 km from the trail's middle, 7 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 52 56 64 73 80 86 89 88 83 73 62 54 Low °F 33 36 42 49 58 66 70 69 63 51 41 36 Precipitation, in 4.6 4.5 4.7 3.9 3.8 4.7 4.7 4.5 4.1 3.4 4.2 4.4 - On the National Register
- Means Street Historic District, Atlanta · historic district, listed 2001 · nomination file for Means Street Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1888 Atlanta sheet (1:125,000); the 1954 Bolton sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Westside Beltline Connector 0.4 mi away · 1.7 mi, paved
- Beltline Access Line 0.4 mi away · 1.6 mi, paved
- Stone Mountain Trail 0.6 mi away · 15.0 mi, paved
- Atlanta Beltline Trail 1.0 mi away · 19.3 mi, paved
- Proctor Creek Trail 1.3 mi away · 2.5 mi, paved
- Lionel Hampton Trail 1.3 mi away · 2.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- PATH Parkway named best new bikeway of 2017 - Georgia Tech (The Mercury) · organization · checked Oct 17, 2026 Supports: 1.5 miles, western edge of campus, Midtown to Downtown, joint funding, 2016 construction, fall 2017 opening, December 5 ribbon-cutting, People for Bikes ranking
- 1.5-mile PATH Parkway at Georgia Tech officially opens - Rough Draft Atlanta · web · checked Oct 17, 2026 Supports: partners, Coca-Cola complex connection, separation from traffic, four bike share stations
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.