States › Georgia

Woodall Rail Trail

Rail-trail in Georgia

Runs through Atlanta · Fulton County

Conditions now

Loading the weather near Atlanta…

Forecast by the National Weather Service for Atlanta · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
0.8 mi 1.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Ellsworth Industrial Boulevard Northwest mile 0.4 directions to trailhead 1
Atlanta, along the trail (opens in a new tab)
Atlanta, along the trail · Photo: AtlChampion · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Woodall Rail Trail is a 0.7-mile trail in Atlanta's Upper Westside and the first completed segment of the Silver Comet Connector, a PATH Foundation project to link the Atlanta BeltLine with the Silver Comet Trail. According to the Upper Westside Community Improvement District, the trail follows Woodall Creek, a tributary of Peachtree Creek, and winds through abandoned rail spurs that were once part of the area's industrial network, passing a preserved 10-acre tract of native plants and wildlife.

The trail begins at the future Northwest BeltLine connection at Ellsworth Industrial Boulevard and Elaine Avenue and runs north to Chattahoochee Avenue at The Works. A bioswale beside the trail pretreats stormwater from Ellsworth Industrial Boulevard and Elaine Avenue before it reaches the creek, and Selig Enterprises paid for a traffic signal and crosswalk at Southland Circle. OpenStreetMap maps the trail as a concrete path designated for bicycles and walkers, with one bridge; this record's map line runs about 0.75 mile.

Construction began in late January 2024, with IP Construction as contractor, and the partners included the Upper Westside CID, the PATH Foundation, Groundwork Atlanta, Trees Atlanta, the city's Department of Watershed Management and Selig. Georgia Department of Natural Resources grants, among them a 2022 Georgia Outdoor Stewardship grant, helped pay for it. Mayor Andre Dickens cut the ribbon on May 9, 2025; Rough Draft Atlanta put the cost at $2.4 million, funded by state and federal grants with matching money from the CID and the PATH Foundation. Selig is working with PATH and the CID to extend the connector along Chattahoochee Avenue beside Woodall Creek, and later segments are to reach the Silver Comet Trail, forming a continuous path of 94 miles to Anniston, Alabama.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and September to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Atlanta Fulton County Airport, 8.8 km from the trail's middle, 2 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F545866748187908984746456
Low °F343743505867706963514136
Precipitation, in4.24.34.53.63.63.8543.43.63.84.2
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Atlanta sheet (1:125,000); the 1954 Bolton sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Woodall Rail Trail, First Segment of the Silver Comet Connector, Breaks Ground in Atlanta's Upper Westside — Upper Westside CID · organization · checked Oct 16, 2026
    Supports: first segment of the PATH Foundation's Silver Comet Connector; route from Ellsworth Industrial Blvd and Elaine Ave to Chattahoochee Ave at The Works; Woodall Creek; abandoned rail spurs; 10-acre preserve; bioswale; Selig signal and crosswalk at Southland Circle; late January 2024 start; IP Construction; partners; DNR grants incl. 2022 GOSP; Selig extension along Chattahoochee Avenue
  3. Woodall Rail Trail opening ribbon cutting — Rough Draft Atlanta (May 9, 2025) · web · checked Oct 16, 2026
    Supports: 0.7 mile; ribbon cutting May 9, 2025 with Mayor Andre Dickens; first completed segment; $2.4 million; state and federal grants with CID and PATH matching funds; 94-mile path to Anniston
  4. Woodall Rail Trail — OpenStreetMap way 1371245377 · web · checked Oct 16, 2026
    Supports: concrete surface, bicycle and foot designated, bridge (way 1521078078), mapped length

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.