Eastside Trolley Trail
Trolley trail in Georgia · OpenStreetMap relation
Runs through Atlanta · DeKalb County
Conditions now
Loading the weather near Atlanta…
Forecast by the National Weather Service for Atlanta · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Woodbine Avenue Southeast mile 0.7 directions to trailhead 1
- Parking at Wade Avenue Northeast mile 1.1 directions to trailhead 2
- Parking at Edgehill Manor mile 1.2 directions to trailhead 3
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Trolley Line Trail, which its builder, the PATH Foundation, calls the Eastside Trolley Trail, is a paved multi-use trail on the east side of Atlanta, Georgia, running through the Edgewood and Kirkwood neighborhoods. Its name honors the historic Atlanta-Decatur trolley line, which ran between Cabbagetown and Agnes Scott College. PATH built the first phase in 1994 along the original trolley corridor between Decatur and downtown Atlanta, with segments around Coan Park and Gilliam Park meant to serve visitors to the 1996 Olympic venues.
The newest phase, built with the City of Atlanta, added one mile that joins the formerly separate segments at Coan Park and Gilliam Park and extends west toward the Atlanta BeltLine's Eastside Trail. Construction by Excellere Construction ran from July 2022 to March 2023 at a cost of about $2 million, largely funded by the city's transportation sales tax, and the trail was formally opened in September 2023, bringing it to 2.2 miles. The route runs along Arkwright Place in Edgewood and Woodbine Avenue in Kirkwood; at Moreland Avenue the Georgia Department of Transportation planned a dedicated signal for pedestrians and cyclists. In Reynoldstown, the planned link to the Eastside Trail stays on city streets, and PATH has said the trail could eventually reach Decatur.
The trail is about 10 feet wide and paved in concrete, with grass strips separating it from the street where room allows. The line mapped here covers about 1.4 miles, from near Moreland Avenue east into Kirkwood.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
34% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Atlanta Peachtree Airport, 14.2 km from the trail's middle, 14 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 52 56 64 73 80 86 89 88 83 73 62 54 Low °F 33 36 42 49 58 66 70 69 63 51 41 36 Precipitation, in 4.6 4.5 4.7 3.9 3.8 4.7 4.7 4.5 4.1 3.4 4.2 4.4 - On the National Register
- Kirkwood Historic District, Atlanta · historic district, listed 2009 · nomination file for Kirkwood Historic District
- Reynoldstown Historic District, Atlanta · historic district, listed 2003 · nomination file for Reynoldstown Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1888 Atlanta sheet (1:125,000); the 1954 Decatur sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationPATH Foundation
Nearby trails
- Beltline Access Line 0.5 mi away · 1.6 mi, paved
- Atlanta Beltline Trail 0.6 mi away · 19.3 mi, paved
- Stone Mountain Trail 0.7 mi away · 15.0 mi, paved
- Decatur Path 2.1 mi away · 1.3 mi, paved
- PATH Parkway 2.7 mi away · 1.7 mi, paved
- East Decatur PATH Greenway Trail 3.0 mi away · 1.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 12697409, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Eastside Trolley Trail Ribbon Cutting — PATH Foundation · organization · checked Oct 16, 2026 Supports: name Eastside Trolley Trail; partnership with the City of Atlanta; 1 new mile connecting previously separate segments at Coan Park and Gilliam Park and extending west toward the Eastside BeltLine
- PATH Foundation officially opens Eastside Trolley Trail — Rough Draft Atlanta (September 7, 2023) · web · checked Oct 16, 2026 Supports: opening in September 2023; trail now 2.2 miles; $2,000,000 cost largely funded by TSPLOST; Excellere Construction; construction July 2022 to March 2023; first phase 1994 along original trolley corridor linking Decatur to downtown Atlanta, for Olympic venues
- 'Trolley Trail' to connect Eastside to Atlanta Beltline moves forward — Rough Draft Atlanta (June 14, 2022) · web · checked Oct 16, 2026 Supports: segments around Gilliam and Coan parks completed before the 1996 Olympics; 10 feet wide; Edgewood, Kirkwood, Reynoldstown and Eastside Trail connection; Walthall Street and Arkwright Place to Woodbine and Wade avenues
- At long last, Eastside Trolley Trail between Kirkwood, BeltLine is happening — Urbanize Atlanta (July 12, 2022) · web · checked Oct 16, 2026 Supports: name honors the Atlanta-Decatur trolley line between Cabbagetown and Agnes Scott College; Woodbine Avenue in Kirkwood; Arkwright Place in Edgewood; GDOT pedestrian and cyclist signal at Moreland Avenue; Reynoldstown sections on-street; grass strips; possible extension to Decatur
- Trolley Line Trail — OpenStreetMap relation 12697409 · web · checked Oct 16, 2026 Supports: concrete surface; extent of the mapped line from near Moreland Avenue east into Kirkwood
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.